BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2021 at 8:00 PM

Updated January 26, 2024

Site work and paving for a transportation facility in Greenville, Mississippi. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**As of May 14, 2021 This project has not yet been awarded. A timeline for award has not yet been established.** This project will provide for the rehabilitation of Taxiway B from the terminal apron to Runway 18L. The rehabilitation will consist of milling the existing asphalt surface, crack and seat the underlying concrete pavement, new asphalt surface, and markings. The project will also include the removal of existing asphalt shoulders and replacement with topsoil and sod. Bid security in the form of a Bid Bond equal to 5% of the total bid is required. Contract security in the form of 100% Performance and 100% Payment Bonds will be required. No bid may be withdrawn after closing time for the receipt of proposals for a period of Ninety (90) days. The DBE participation goal is 10.5%. Questions regarding portal registration, Electronic orders or electronic bidding, please contact Plan House Printing at (228) 248-0181. The Owner reserves the right to waive irregularities and to reject any or all bids. Cut-off Date for Questions: Wednesday, March 10, 2021 at 12:00 Noon, Central Time

Award

Transportation Terminals

$4,094,929.00

Public - City

Paving, Site Work

94

17

7

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
26
Bidding Soon
380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2021

April 16, 2021

Project location map

340 Main St, Greenville, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.