BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2020 at 8:00 PM

Updated September 15, 2023

Site work and paving for a bridge / tunnel in Harvard, Nebraska. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project consists of furnishing all materials for and the construction of a single span Precast Concrete Bridge including, but not limited to the following: structural steel, steel piling, steel sheet piling, concrete precast panels, bridge rail, fill, roadway materials, miscellaneous hardware and all other associated work as indicated on the drawings and within the specifications.

Award

Bridges / Tunnels

$421,276.00

Public - County

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
30
Bidding Soon
363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2020

August 21, 2020

Project location map

Multiple Locations, Harvard, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.