Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Porterville, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Furnishing to said City all labor, materials, equipment, transportation, and services for the Newcomb Street Reconstruction Project, including asphalt, curbs, gutter, sidewalk, ADA curb ramps, water main, storm drain, traffic signal upgrade, and all other appropriate appurtenances. A Certified Check, Cashier's Check, or Bidder's Bond in the amount of ten percent (10%) of the bid made payable to the City of Porterville will be required to accompany each proposal. Any contract entered into pursuant to this notice will incorporate only the applicable provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Special attention is directed to Section 1720.9 of the Labor Code which now provides that the hauling and delivery of ready-mix concrete for a Public Works project is subject to prevailing wage rates and other related requirements. As per SB854, passed by California State Senate on June 20, 2014, contractors and subcontractors will now be required to register with the California Department of Industrial Relations (DIR). A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, disability, gender, age, sexual orientation, or religion will also be required. The City hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, disability, gender, age, sexual orientation, or religion in any consideration leading to the award of contract. No qualified disabled person shall, on the basis of disability, be excluded from participating in, be denied the benefits of, or otherwise be subject to discrimination. No bid will be accepted from a Contractor who is not duly licensed in accordance with the provisions of Chapter 9, Division III, of the Business and Professions Code, and has a current Class A, General Engineering, State of California Contractor's license. The right is reserved by the City of Porterville to reject any or all bids, to evaluate the bids submitted and to award the contract according to the proposal which best serves the interests of said City. The successful bidder will be required to furnish the City of Porterville with a "Performance Bond" in the amount of one hundred percent (100%) of the contract and a "Labor and Materials Bond" in the amount of one hundred percent (100%) of the contract amount. Upon receiving the "NOTICE OF AWARD," the successful bidder has TEN (10) DAYS to submit the signed contract together with all required bonds, insurance and licenses to the Project Manager, and meet with the City in a PRE-CONSTRUCTION MEETING to discuss any problems or questions pertaining to this project. It is the Contractor's responsibility to contact the City's Project Manager immediately, to arrange for the PRE-CONSTRUCTION MEETING during the TEN (10) DAY PERIOD. The Contractor shall have Fifty (50) working days from the effective date of the NOTICE TO PROCEED to complete the required work. THE PROJECT START DATE IN THE NOTICE TO PROCEED SHALL BE AUGUST 24, 2020. The Contractor shall pay the City LIQUIDATED DAMAGES in the amount of THREE THOUSAND DOLLARS ($3,000.00) a day for each calendar day the project is delayed beyond the "TIME OF COMPLETION DATE." The City will withhold five percent (5%) retention from payments due the Contractor until thirty-five (35) days after date of recordation of the Notice of Completion. The Contractor may elect to receive one hundred percent (100%) of payments due under the contract by depositing securities of equivalent value with the City in accordance with the provisions of the California Public Contract Code Section 22300. Such securities, if deposited by the Contractor, shall be valued by the City, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 22300 and Section 16430 of the California Government Code. A log of borings is contained in the appendix for use by the Contractor. It is intended to aid the Contractor in establishing the type of soils to be encountered but may or may not be indicative of all soil types to be found throughout the project limits. *This project timeline has been extended due to the public health crisis.
Final Planning
Roads / Highways
$4,270,145.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2021
February 7, 2022
Newcomb St, Porterville, CA
Related To This Project
Porterville, CA
Bid Date: Sep 13 2022
Porterville, CA
Bid Date: Aug 29 2022
Porterville, CA
--
Porterville, CA
--
Porterville, CA
--
Porterville, CA
--
Porterville, CA
Bid Date: Apr 24 2023
Porterville, CA
Bid Date: Apr 05 2023
Porterville, CA
Bid Date: Dec 02 2020
Porterville, CA
--
Porterville, CA
Bid Date: Sep 21 2022
Porterville, CA
Bid Date: Jul 31 2020
Porterville, CA
Bid Date: Jul 19 2022
Porterville, CA
Bid Date: Aug 29 2022
Porterville, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.