BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2020 at 8:00 PM

Updated August 19, 2025

Site work and paving for a mixed-use development in Bolton, Ontario. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Work of this Contract comprises of the supply of all materials, labour and equipment required for upgrades to Bolton North Hill Sewage Pumping Station as described herein and shown on the Contract Drawings. The Work includes, but is not limited to: - Installation of buried emergency storage pipe. - Installation of influent sanitary maintenance hole with inline grinder, isolation valve and gravity sewer connection from proposed emergency storage pipe. - Removal of existing structures and equipment from wet well, and reparation and coating of interior concrete walls. - Installation of new higher capacity pumps, process piping, and appurtenances in wet well. - Replacement of precast wet well roof slab to accommodate new equipment. - Installation of precast concrete valve chamber downstream of wet well with inline flow and pressure monitoring, by-pass connection, check valves and isolation valves. - Installation of new sections of forcemain between wet well and new valve chamber, and from new valve chamber to existing forcemain on-site. - Replacement of emergency standby generator with higher capacity unit, including new exhaust piping and stack, and associated upgrades to building ventilation. - Installation of concrete curb for secondary fuel containment around both generator and fuel storage tank. - Replacement of existing motor control centre (MCC) and associated electrical equipment to accommodate new equipment. - Replace asphalt singles on control building roof with metal roofing system. - Site grading including retaining wall to accommodate proposed valve chamber and parking lot expansion. - Installation of air valve chamber and new section of forcemain to tie into existing forcemain on Crestridge Drive. Documents and addenda can be obtained at: https://peelregion.bidsandtenders.ca

Award

Water / Sewer

$3,872,150.00

Public - County

Paving, Site Work

115

22

38

15

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
10
Bidding Soon
2,943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2020

October 27, 2020

Project location map

Castelli Ct, Bolton, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.