BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to a mixed-use development in Austin, Texas. Completed plans call for the renovation of a educational facility; and for the addition of a 12,028-square-foot, two-story above grade theater / auditorium.

Addition of a 2 story building that will house 2 dedicated dance studios, with wood sprung floors on the main level, and service and support spaces on the second floor. The building is an addition to the existing Performing Arts Center at McCallum High School. Scope includes partial and selective demolition of existing site features, as well as partial demolition of the existing awning, where the new building will tie in. Architectural: Addition of a 2 story, 12,000 SF building. Light frame metal stud exterior framing with masonry veneer finish, 5/8" air and water resistive sheathing board, 1.5" continuous semi rigid mineral wool board insulation, fluid applied air barrier with stainless steel flashing. Anodized aluminum will be utilized for storefront and window systems. Roofing: new roofing with Modified Bitumen and rooftop equipment. Civil: Site Plan Revision through City of Austin to reconfigure parking lot and impervious coverage of new building footprint. Plumbing: Addition of two full restrooms with showers and lockers for students, Dance teacher office with Restroom. HVAC: Mechanical rooftop units and addition of chiller plant to service the Dance Studio Building. Electrical: Light package designed for Dance studio as well as controls for supporting spaces, office, costume storage, showers/changing rooms. Structural: The building foundation will consist of drilled piers, slab on select fill, perimeter grade beams and thickened slab between piers. Structural steel columns and steel beams, with metal deck comprise the structural frame system. MBE = 11.7% (African American (AA) 1.7% , Asian/Native American (A/NA) 1.9%, Hispanic (H) 8.1% ) WBE: 10.2% All Questions pertaining to this CSP must be submitted through the AISD Bonfire Portal no later than February 23, 2022 by 3:00PM (CST). Estimated Budget: $3,841,800.00 Addendum #1-#3 have been issued as of 3-3-2022.

Award

Theaters / Auditoriums

$6,485,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,352
All Active Projects
917
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

June 16, 2022

img_map_placeholder

5600 Sunshine Dr, Austin, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.