BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Grafton, Ohio. Completed plans call for the construction of a 12,000-square-foot fire / police facility; and for site work for a fire / police facility.

Request for Qualifications and Announcement of Available Contract for Architectural/ Engineering Services. Eaton Township, Lorain County, Ohio intends to contract for Architectural/ Engineering services for a New Fire Station Facility. The Statement of Qualifications shall include information regarding the firm's history, education and experience of owners and key personnel who will be assigned to this project; the firm's designated lead Architect/Architect-in-Charge's experience in performing architectural schematic design, design development, construction documents, and construction administration and observation; availability of staff; the firm's equipment and facilities; and a minimum of five (5) references from similar size projects. It should also include what services or assistance will be available to the township to help with the capital improvement levy campaign. Statements of Qualifications should be submitted to: Eaton Township Trustees - Fire Station RFQ 12043 Avon Belden Rd. Grafton, Ohio 44044 Please submit five (5) copies of the Statement of Qualifications. As required by the Ohio Revised Code Section 153.65-73, firms responding will be evaluated and ranked in order of their qualifications. Following this evaluation, the owner will enter into contract negotiations with the most highly qualified firm. The new station will be approximately 10,000 -- 12,000 SF in size and incorporate all the main functions of a fire and rescue facility. The total project budget for the project is approximately Three Million Dollars (S3,000,000). This includes all soft costs such as Architectural/ Engineering Fees, furnishings and fixtures. The source of funding will be dependent on the passage of a Capital Improvement levy The anticipated dates for design start-up/completion are September 1, 2020/ February 28, 2021 The anticipated dates for construction start-up/ completion are April 1, The method of contractor selection has not been determined at this time.

Post-Bid

Fire / Police

$3,000,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
71
Bidding Soon
1,086
All Active Projects
443
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2021

img_map_placeholder

To Be Determined, Grafton, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.