BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2020 at 7:00 PM

Updated May 7, 2025

Renovation of a water / sewer project in New Smyrna Beach, Florida. Completed plans call for the renovation of a water / sewer project.

Building Architectural: o Replacement of existing entry gate with new powder-coated gate. o Replacement of barbed wire around of the perimeter of the property. o Replacement of existing single and double door jams and doors. o Removal of all existing louvers in space. o Partial CMU block fill in of existing NE louver in preparation of new Bard exterior all in one HVAC unit. o New roll-up door in the place of 2 existing south facing louvers. o New concrete apron from existing asphalt roadway to new roll-up door entry way. o New CMU screen wall on west and south sides of property with barbed wire. o New concrete slab for exterior generator fuel tank. o Demo of existing Generator pad and new thicker and wider pad installed. Electrical: o New electricalservice upgrade to 480V/3 Phase. o All existing electrical gearshall be replaced with new, includes: o Main breaker - 400A/3 o Automatic Transfer Switch - 400A/3 Pole o Generator - 200kW/250kVA/480V/3 o Distribution Panel - 400A/3 o Generator Connection Box o Transformer - 45kVA/480V-208V/3 o Panelboard - 150A MB/208V/3 o New interior and exterior LED light fixtures. o New conduits for card reader access and security cameras. o Relocate existing DFS system to NE corner of building. o Re-work and consolidation of existing DFS system conduits for new system location. o Scope also includes conduits for various telemetry, controls, generator controls, power circuits, and spare conduits, as well as hand-holes for easy access in the future. Mechanical/Plumbing: o Demo of all pumps, motors, starters, etc. associated with pumping capabilities of the pump station. o (3) New 75HP motor / pump combos o 3 - 12 Pulse VFDs: Rated at 75HP New pedestals for motor/pump combo. o New motorized louver for generator intake. o Controls for motorized louver to open when generator is in operation. o New Bard 10-ton HVAC unit o Interior metal shroud/duct for generator exhaust. o Exterior metal scoop to push generator exhaust vertically once outside of the building. o Re-locate existing chlorine drain piping per new chlorine analyzer's location. o Demo existing concrete tank and sump pump. o Cut existing 3" iron drain pipe and extend with new 3" PVC to low spot at the rear of the property. Add new exterior clean out within 4 feet of building July 31, 2020 DEADLINE FOR FINAL QUESTIONS BY 2:30 P.M. E-MAIL: cfisher@ucnsb.org Questions regarding any portion of this bid shall be directed, in writing, to: Utilities Commission, City of New Smyrna Beach Caleb Fisher, Purchasing Agent cfisher@ucnsb.org or P.O. Box 100 New Smyrna Beach, FL 32170-0100 *This project timeline has been extended due to the public health crisis.

Bid Results

Water / Sewer

$842,275.00

Public - City

Renovation

15

1

19

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
108
Bidding Soon
1,641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2020

September 17, 2020

Project location map

4460 S Atlantic Ave, New Smyrna Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.