BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2020 at 8:00 PM

Updated December 17, 2024

Site work for a civil project in Cold Spring, Minnesota. Completed plans call for site work for a water / sewer project.

As of August 11 , 2020 the Wells 8&9 Pumping Facilities to C & L Excavating for a bid amount of $773,204.80. The project consists of the following approximate quantities: 800 LIN FT 12" & 16" PVC Watermain 1,800 CU YD Common Excavation 3,600 TON Aggregate Surfacing Class 2 1 LUMP SUM Electrical Installation 2 EACH Well Pump Facilities including vault, controls, and 75 HP Motor Along with miscellaneous electrical components and installation, well components and installation, watermain components, removals, restoration, and correlated appurtenances. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Bidders shall submit the Proposal Guarantee electronically by the date and time set for opening Proposals. Bidders shall file an original hard copy of the Proposal Guaranty with the City within 48 hours after the date and time for the opening of Proposals. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids.

Award

Water / Sewer

$773,205.00

Public - City

Site Work

21

1

2

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
144
Bidding Soon
1,440
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2020

September 8, 2020

Project location map

Multiple Locations, Cold Spring, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.