Site work for a water / sewer project in South Gate, California. Completed plans call for site work for a water / sewer project.
Construction of South Gate Transfer Station Stormwater Capture System Modifications, Located at 9530 Garfield Ave, South Gate, California 90280. The Work Consists of Installation of High-density Polyethylene (Hdpe) and Polyvinyl Chloride (Pvc) Pipelines, Precast Concrete Underground Structures, Valves, Instrumentation, the Associated Electrical Power and Controls, Grading and Paving, and All Appurtenant Work. The Engineers Estimate Range for This Project is $560,000 - $940,000. The Successful Bidder Must File Good and Sufficient Bonds for the Faithful Performance of the Contract and for the Payment of Laborers and Materialmen. Bonds for the Faithful Performance of the Contract and for the Payment of Laborers and Materialmen That Are Issued by Sureties That Are Listed in the Latest Version of the U.s. Department of Treasury Circular 570 and That Are Authorized to Issue Bonds in the State of California, and Whose Bonding Limitation Shown in the Circular is Sufficient to Provide Bonds in the Amount of the Contract, Will Be Deemed Approved Unless Specifically Rejected. Bonds Issued by All Other Sureties Are Subject to Approval by the Board of Directors and Must Be Accompanied by All of the Documents Enumerated in California Code of Civil Procedure 995.660(a), as Amended. At the Time of Bid, the Contractor Shall Possess a Valid California Contractors License in the Following Classification: General Engineering "a" at the Request and Expense of the Contractor, Securities Equivalent to the Amount Withheld From Progress Payments May Be Deposited With the District or With a State or Federally Chartered Bank as the Escrow Agent, Who Shall, During the Performance of the Work, Hold Such Instruments in the Name of the District, and Return Such Securities to the Contractor Upon Satisfactory Completion of the Contract. The Option of Placing Funds in Escrow is Provided to Contractor Pursuant to California Public Contract Code 22300; Should That Law Cease to Be Effective, Contractor Shall Not Have This Option as to Any Progress Payment Paid or Payable After the Date the Law Ceases to Be Effective. Securities Eligible for Investment Under This Provision Include Those Listed in 16430 of the Government Code or Fdic Insured Bank or Savings and Loan Certificates of Deposit. The Contractor Shall Be the Beneficial Owner of Any Security Substituted for Monies Withheld and Shall Receive Any Interest Thereon. Each Bid Must Be on a Proposal Form Obtained and Downloaded From the Links Provided Above and Must Be Accompanied by a Certified Check, Cashiers Check, or Bond With an Approved Surety Company as Surety, Payable to Los Angeles County Sanitation District No. 2 or Other Authorized Security Provided by Public Contract Code 20784, for an Amount Equal to at Least Ten Percent of the Amount Bid as a Guaranty That the Bidder, if Successful, Will Enter Into a Contract Satisfactory to the Board of Directors for Completing the Work Contemplated. The Board of Directors May Reject All Bids. Unless All Bids Are Rejected, Award Will Be Made to the Low, Responsive, Responsible Bidder. The Work of Construction Must Be Completed Within 225 Working Days After the Date in the Notice to Proceed. Bidders on This Work Will Be Required to Comply With the President's Executive Order No. 11246. Pursuant to Applicable Provisions of the Labor Code of the State of California, Not Less Than the General Prevailing Rate of Per Diem Wages and Not Less Than the General Prevailing Rate of Per Diem Wages for Legal Holiday and Overtime Work for Each Craft or Type of Workman Needed to Execute the Work Contemplated Under the Agreement, as Ascertained by the Director of the Department of Industrial Relations, Must Be Paid to All Workers Employed on the Work by the Contractor or by Any Subcontractor Doing or Contracting to Do Any Part of the Work. A Copy of the Listing of the General Prevailing Wage Rates May Be Obtained From the State of California Department of Industrial Relations, Director's Office of Policy, Research and Legislation, Prevailing Wage Unit, at (415) 703-4774
Bid Results
Water / Sewer
$949,150.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2020
September 10, 2020
9530 Garfield Ave, South Gate, CA
Related To This Project
South Gate, CA
Bid Date: May 14 2025
South Gate, CA
Bid Date: Oct 09 2025
South Gate, CA
Bid Date: Jun 23 2025
South Gate, CA
Bid Date: Dec 18 2025
South Gate, CA
Bid Date: Sep 30 2025
South Gate, CA
Bid Date: Oct 06 2025
South Gate, CA
--
South Gate, CA
Bid Date: Mar 27 2025
South Gate, CA
Bid Date: Apr 17 2025
South Gate, CA
Bid Date: Mar 13 2025
South Gate, CA
--
South Gate, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.