EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2020 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Pottstown, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

Project generally comprises site improvements to include seeding of select areas with special seeds, planting of shade, flowering and evergreen trees, and shrubs; and restoration to all existing seeded and paved areas disturbed by construction operations. The Work shall be substantially completed within 330 calendar days after the date when the Contract Times commence to run as provided in General Conditions Paragraph 2.03 as amended by the Supplementary Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 345 calendar days after the date when the Contract Times commence to run Questions must be submitted Electronically and will not be received in any other manner. The Contract will be subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania, Department of Labor and Industry. Attendance at the pre-bid meeting and site visit is not mandatory, but it is recommended. The Owner hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities not involving price, time, or change in the Work, in any Bid. It is a requirement of this Contract that at least 50% of the Work be performed by prime Bidder’s own work force, not by subcontractor(s). TMP #'s: 18-4-120.2, 18-4-120.1, & 18-4-132.1 Each Bid must be accompanied by Bid security in the form of a certified check, bank check, irrevocable letter of credit, or Bid bond (on the form included with the Bidding Documents) for ten percent (10%) of the Bid total of the General Conditions sets forth Owner's requirements as to Performance and Payment Bonds to be provided by the Contractor. When the apparent Successful Bidder delivers the signed Agreement to Owner, it must be accompanied by the required Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price, on the forms provided in the Bidding Documents. Substitute Bond forms are not acceptable

Award

Playgrounds / Parks / Athletic Fields

$73,331.00

Public - City

Site Work

5

12

2

7

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
197
Bidding Soon
2,860
All Active Projects
1,361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2020

September 1, 2020

img_map_placeholder

855 Ellis Woods Rd, Pottstown, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ellis Woods Park Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.