Published September 16, 2020 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Menifee, California. Completed plans call for site work for a water / sewer project.

Due to COVID-19 the District is closed to public access; therefore, bids will not be publicly opened. The Preliminary Bid Summary will be posted on the website electronically no later than 10:00 a.m. the next day. Bonding Estimate: $2 - $2.5 Million Project Location: City of Menifee along McCall Boulevard between Valley Boulevard and Bradley Road, and along Bradley Road, 250 feet north and 200 feet south of the intersection of Bradley Road and McCall Boulevard. The work to be constructed is located in the City of Menifee along McCall Boulevard between Valley Boulevard and Bradley Road, and along Bradley Road, 250 feet north and 200 feet south of the intersection of Bradley Road and McCall Boulevard. The work comprises construction of approximately 6,800 linear feet of 12-inch PVC pipe including all appurtenances, connections to existing lines, services, and installation of new fire hydrants. The work will also include installing approximately 100 linear feet of welded steel pipe on a bridge along an existing reinforced concrete box culvert between Grosse Point Drive and Northwood Drive, abandonment of approximately 6,500 linear feet of 12-inch diameter pipe along McCall Boulevard and abandonment of approximately 300 linear feet of 8-inch diameter pipe along Bradley Boulevard. Work shall include all restrained joints, thrust blocks, valves blow-offs, air valves, water services, shoring and bracing per California Labor Codes, backfill, pavement removal, replacement and restoration per encroachment permits, trench and pipeline dewatering, high lining service connections as needed, disinfection, traffic control, SWPPP, and other related appurtenant work. All work shall be in accordance with these specifications and contract drawings All questions must be submitted in writing by 5:00 p.m. on THURSDAY, JULY 16, 2020 to Mr. Nathaniel Olivas c/o Bea Pillow; EMAIL: olivasn@emwd.org & pillowb@emwd.org. Questions received after this time may not be responded to. All bonds shall be executed by admitted surety insurers, as defined in Code of Civil Procedure section 995.120. Each proposal must be accompanied by a certified check or satisfactory surety bond (by utilizing the District's Bid Bond form BB-1) for not less than 10% of the bidder's total contract price as a guarantee that the bidder shall, within seven (7) days after the mailing of a notice of acceptance of bid by the District to the bidder, enter into the written contract supplied by the District. The District shall return the bid bond, upon request. The Contractor shall furnish a faithful performance bond in an amount equal to 100% of the amount of the contract and a labor payment bond in an amount equal to 100% of the contract amount. No bid or bid security may be withdrawn for seventy-five (75) calendar days after the date bids are received. The successful bidder shall, within seven (7) calendar days after the District mails a notice of acceptance of bid, return the signed agreement and bonds, and attend the pre-construction conference at the District office. The contract period shall commence seven (7) calendar days from the date of the Notice-ofAcceptance-of-Proposal. The Contractor shall complete all work, including testing, within Three Hundred and Sixty (360) calendar days. Solicitation: . T2868-22-02, KJ 1844013.00

Award

Water / Sewer

$2,113,000.00

Public - County

Site Work

46

1

8

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Geophysical Investigations, Seismic Investigations
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Seal Coats, Rigid Paving, Concrete Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Manufacturing Equipment, Assembly and Testing Equipment, Applicators

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
100
Bidding Soon
2,227
All Active Projects
926
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2020

October 2, 2020

img_map_placeholder

McCall Blvd, Menifee, CA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

McCall Boulevard Pipeline Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.