BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Boynton Beach, Florida. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.

As of October 6, 2022, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation Professional Liability Insurance : $1,000,000.00 SR 9/I-95 from South of Woolbright Road and SR-9/I-95 @ 10th TRC Members (Subject to Change) : Fausto Gomez Humberto Arrieta WILLIAM SONNETT The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. FM#43727913201 SR-9/I-95 from South of Woolbright Road to North of Woolbright Road (Ad#21418) FM#41273313201 Design of interchange improvements for I-95 at 10th Ave. (Ad#21444) Two contracts will be selected from this advertisement Interested firms are required to only address FM#43727913201 SR-9/I-95 from South of Woolbright Road to North of Woolbright Road in the Letter of Response. Firm 1 will be awarded FM#43727913201, Estimated amount $1,020.000.00 Firm 2 will be awarded FM#41273313201, Estimated amount $900,000.00 Advertisement Date 9/29/2020 Response Deadline Date/Time 10/13/2020 02:30 am Shortlist Selection Date/Time 11/01/2020 07:30 pm Final Selection Date/Time 12/07/2020 07:30 pm Negotiations Period Begin Date 12/15/2020 Negotiations Period Ending Date 2/13/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 9/I-95 from South of Woolbright Road and SR-9/I-95 at 10th Avenue

Conceptual

Bridges / Tunnels

$26,560,732.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
53
Bidding Soon
1,164
All Active Projects
530
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

img_map_placeholder

I-95, Boynton Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.