BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Milwaukee, Wisconsin. Completed plans call for the renovation of a 11,800-square-foot playground / park / athletic field.

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. Divert [5] % by weight or volume of total waste generated through Substantial Completion All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page or upon request from DFD-email dfdcertification@wisconsin.gov. Any comments or questions shall be directed to Tim Walsdorf at H-CAD Inc. Telephone (920) 894-7089. Cell (920) 286-2350 Email bigh0@frontier.com A bid bond prepared on the Bid Bond Form bound herein, payable to the State in the amount not less than 10% of the maximum bid shall accompany each bid as a guarantee. Bidder is required to furnish separate 100 % performance and 100 % payment bonds to the benefit of the Department of Administration as the sole obligee. In general, the work consists of: Roof replacement at North Gate, 3,000 sq. ft of existing failed Modified bitumen with new 1/4 per foot tapered polyisocyanurate insulation and 060 fully adhered EPDM. Roof replacement on Horse Barn, 8,800 sq. Ft of existing failed built up roofing - smooth with new 1/4 per foot tapered polyisocyanurate insulation & 060 fully adhered EPDM. the system also includes new metal flashings and copings. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Award

Playgrounds / Parks / Athletic Fields

$156,419.00

Public - State/Provincial

Renovation

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
55
Bidding Soon
1,223
All Active Projects
542
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2020

August 26, 2020

img_map_placeholder

640 S 84th St, Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.