EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2020 at 8:00 PM

Updated May 7, 2025

Renovation of a mixed-use development in Palm Beach Gardens, Florida. Completed plans call for the renovation of a water / sewer project; and communication facility.

*Project has been awarded to C.C. Control Corp* The Work is Generally Described as Follows. The Project Includes Conversions and Improvements to the Remote Telemetry Units (Rtu) at Seacoast Utility Authority. The Project Includes Plc Programming and Modifications for Twenty-nine (29) Reclaimed Water Distribution and Metering Stations and Installation of a New Master Cellular Antenna and Radio at the Operations Building. The Rtu's Will Be Converted From a Vhf Radio Communications System to Cellular Technology. The Rtus Will Be Converted From a Proprietary to an Open-architecture System. The Work Also Includes Coordinating With the Owner to Establish Communication for Scada/hmi Programming. Contractor Shall Furnish and Install New Rtu Panels, Modify Existing Rtu Panels, New Cellular Antennas, Radios, Conduit, Wiring, Testing, Start-up, and All Other Ancillary Work and Equipment for a Fully Functioning System as Shown on the Drawings and Specifications. A Cashiers Check or a Bid Bond in a Sum Not Less Than Five Percent (5%) of the Amount of the Bid, Made Payable to Seacoast Utility Authority (Bid Security) Shall Accompany Each Bid as a Guarantee That the Bidder Will Not Withdraw From the Competition After the Opening of Bids. The Sureties for the Bid Bond and Public Construc Tion Bond Must Be an Entity Included in the Most Recent United States Department of Treasury List of Acceptable Sureties and Be Authorized to Issue Surety Bonds in Florida. Bid Security Shall Be in a Single Acceptable Instrument. If Bid Security is Made by Cashier's Check, the Conditions Contained in the Bid Bond Shall Nonetheless Apply to the Cashiers Check as They Relate to Forfeiture or Damages. No Bids May Be Withdrawn for a Period of Ninety (90) Days After the Day of Bid Opening. The Cost of Bid Preparation is Considered an Operational Cost of Bidders and Shall Not Be Passed on or Borne by the Owner. The Successful Bidder, Who is Awarded the Contract, Will Be Required to Furnish a Public Construction Bond in Full Contract Amount in Accordance With Florida Statute Section 255.05, and to Submit a Certificate of Insurance Demonstrating Conformance With the Contract Documents. For This Project Builder's Risk Insurance is (is Not) Required. Failure to Provide the Required Bond or Insurance(S) Shall Be Grounds to Reject the Bid and Shall Result in the Owner Retaining the Bid Security to the Full Extent of Owner's Damages. Bids Shall Be Prepared, Addressed and Submitted in Compliance With Detailed Instructions as Set Forth in the Instructions to Bidders All Forms and Questionnaires Must Be Filled Out Completely as Instructed. Failure to Complete the Bid Forms as Instructed and Provide the Requested Information, or to Fully Execute the Bid, Shall Be Grounds for Rejection of the Bid and Shall Result in the Owner Retaining the Bid Security to the Full Extent of Owner's Damages. Seacoast Utility Authority Reserves the Right to Reject Any or All Bids in Whole or in Part, With or Without Cause, to Waive Irregularities, Variances, Deviations, Technical Errors and Informalities to the Extent Permitted by Law, or to Accept the Bid Which in Its Judgment Best Serves the Public Interest. Contract time is 330 days for Substantial and 360 days for Final Completion.

Award

Water / Sewer

$532,900.00

Public - City

Renovation

56

13

6

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Quality Assurance, Quality Control, Execution and Closeout Requirements, Execution, Application, Erection, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Transformers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
48
Bidding Soon
1,083
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2020

September 9, 2020

img_map_placeholder

4200 Hood Rd, Palm Beach Gardens, FL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Reclaimed Water System RTU / SCADA Conversion

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.