BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in El Mirage, Arizona. Completed plans call for site work for a water / sewer project.

Project Description: The project will consist of the installation of approximately 2,600 linear feet of 6- inch PVC water main; installation of 69 new 1" Municipex water service lines with new meter boxes, valves, and fittings; removal and replacement of street pavement sections; and construction of other related appurtenances and items of work within an existing Public Utility Easement between Alto Street and Palm Street from Thunderbird Road to End Street. Additional work includes, but is not limited to, the removal and replacement of curb and sidewalk, abandonment of existing water lines after the new water main has been placed in service, valve frame and cover adjustments, traffic control, mobilization and site restoration. There are also two alternate bids: Alternate Bid No. 1 includes only improvements between Thunderbird Road and Ventura Street (927 linear feet of water main) while Alternate Bid No. 2 only includes improvements between Thunderbird Road and Well Street (1,900 linear feet of water main). The revisions from the Alternate Bids and the Base Bid designs are shown on Sheet ALT of the plans and cataloged in the Bid Schedules. Final Date for Inquiries: July 23, 2020 2:00 p.m., Arizona time The City received approval from the Maricopa County Human Services Department for FY2019/2020 Community Development Block Grant (CDBG) funding for the replacement of existing water mains within Downtown El Mirage. The primary project Base Bid item work will consist of the installation of approximately 2,600 linear feet of 6-inch C900 DR18 CL235 PVC water main; installation of 69 new 1 inch Municipex water service lines with new meter boxes, valves, and fittings; removal and replacement of street pavement sections; and construction of other related appurtenances and items of work within an existing Public Utility Easement between Alto Street and Palm Street from Thunderbird Road to End Street. Additional work includes, but is not limited to, the removal and replacement of curb and sidewalk, abandonment of existing water lines after the new water main has been placed in service, valve frame and cover adjustments, traffic control, mobilization and site restoration. There are also two alternate bids: Alternate Bid No. 1 includes only improvements between Thunderbird Road and Ventura Street while Alternate Bid No. 2 only includes improvements between Thunderbird Road and Well Street. The revisions from the Alternate Bids and the Base Bid designs are shown on Sheet ALT of the plans and cataloged in the Bid Schedules.

Award

Water / Sewer

$478,592.00

Public - City

Site Work

15

8

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
11
Bidding Soon
681
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.