BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Cave Creek, Arizona. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of March 5, 2021, a firm construction timeline has not been established. The City of Phoenix is seeking a qualified contractor to provide preconstruction services and complete construction services for the Booster Pump Station (BPS) Improvements Construction Manager at Risk (CMAR) project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project along with coordinating with the 16" Cave Creek Pipeline CMAR contractor (selected through a separate advertisement). The 10A-B1 BPS project sites is located at 33005 N 52ND ST. Design phase services for this project are funded in Fiscal Year 2019/20 with Construction in Fiscal Year 2021/22. The City of Phoenix will NOT accept responses submitted after the Date and Time stated in the Solicitation, nor will the City of Phoenix accept responses submitted by fax or e-mail. PLEASE NOTE: If you download a Solicitation, you also need to download all current addenda that may have been issued since the original document was posted. It is the Bidder's responsibility to ensure that they have all addenda prior to submitting their offer. The City needs to make improvements and upgrades to the 10A-B1 BPS to increase pumping capacity by rehabbing the site and constructing a new suction piping to serve 10A-B1. The proposed BPS improvements will require extensive coordination with Operations and other divisions, as well as with the Town of Cave Creek and their representatives. As the new BPS operation is dependent on completion of the separate construction of the two new 16” Waterlines, construction activities will need to be performed in parallel within a tight construction schedule and budget. It is anticipated the construction will be completed by Fall 2022. The selected firm will also need to coordinate with Remote Facilities and Distribution for shutdown and isolation of the BPS and Waterlines BPS 10A-B1 (33005 N 52 nd St) • Firm Capacity: 5.8 MGD • New mechanical equipment, including all new pumps, pump cans, suction and discharge piping, valves, and related equipment, • New surge/hydropneumatics system, • Upgraded primary electrical service, • New Service Entrance Section, • New electrical gear, instrumentation, and controls, • New generator to meet increased standby power requirements, • Minor site improvements, including minor rehabilitation items and improvements to the existing 9A-B2 BPS that served the existing 10A-B1 BPS that will be demolished, and • Demolition of the existing 10A-B1 BPS, associated electrical gear, instrumentation, and controls.

Award

Water / Sewer

$3,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
1,017
All Active Projects
439
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 31, 2020

May 31, 2021

img_map_placeholder

33005 N 52nd St, Cave Creek, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.