Site work for a water / sewer project in New Bedford, Massachusetts. Completed plans call for site work for a water / sewer project.
**The project was awarded to Revoli Construction for $1,072,211.76.** The work of this project includes, but is not limited to, furnishing and installing 4-inch, 6-inch, 8-inch, and 12- inch cement lined ductile iron water main with polyethylene encasement, valves, fittings, hydrants, water services, connection into existing mains; furnishing, installing and removing temporary bypass piping (as required and approved by City and Engineer), abandoning existing water mains and hydrants; and furnishing and installing all appurtenances, incidentals and all other related and required work for successful completion of the project from east of MA Route 140 bridge crossing to the intersection of Kings Highway and Tarkiln Hill Road on Kings Highway New Bedford, Massachusetts. The contract time shall be 120 calendar days commencing twenty days following the effective date of the agreement. Each prospective bidder proposing to bid on this project must be prequalified by Massachusetts Department of Transportation (MassDOT) in accordance with 720 CMR 5.00 "Prequalification of Contractors." Contact the MassDOT Highway Division (Prequalification Office) Room 6260, 10 Parks Plaza, Boston, MA 02116 (617- 973-7621). Prospective bidders are not expected to submit a R109 form. Bidders must be prequalified for individual water main installation project limits equal to or greater than their respective bid price. Contractors may obtain informational copies of the bid documents but will not be considered an eligible bidder without having obtained MassDOT prequalification prior to the date and time of the bid opening. The contract will only be awarded to a MassDOT prequalified contractor. Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Bond in the amount of five percent of the Bid. Complete instructions for filing Bids are included in the Instructions to Bidders. The Successful Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the City. Minimum Wage Rates as determined by the Commissioner of the Department of Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27H, as amended, apply to this project. It is the responsibility of the Contractor, before bid opening, to request if necessary, any additional information on Minimum Wage Rates for those tradespeople who may be employed for the proposed work under this Contract. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. The work under this Contract is funded in part by the Massachusetts Clean Water Trust (the "Trust") through a Drinking Water State Revolving Fund (DWSRF) loan. Prospective contractors shall be aware of and comply with all requirements of receiving monies from the "Trust". Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs. The two low bidders shall submit completed DBE forms (EEO-DEP- 190C & EEO-DEP-191C and the DBE Certification of United States Citizenship form) by the close of business on the third business day after bid opening. Failure to comply with the requirements of this paragraph may be deemed to render a proposal non-responsive. No waiver of any provision of this section will be granted unless approved by the Massachusetts Department of Environmental Protection (MassDEP). This Project requires compliance with the MassDEP's Diesel Retrofit Program by use of after-engine emission controls that are EPA certified, or their equivalent, on all of the off-road (non-registered) diesel . The contract will be awarded within thirty (30) days after the proposal opening. The time for award may be extended by mutual agreement between the City and the awarded vendor. Questions related to the project shall be submitted in writing to the attention of Marc F. Weller, P.E. of CDM Smith by mail to 260 West Exchange Street, Suite 300, Providence, RI 02903 or by email at wellermf@cdmsmith.com. Questions will be received up to Wednesday, July 22 at 4:00 pm. The final addendum will be issued by COB on July 24, unless the addendum is for purposes of extending the bidding period.
Award
Water / Sewer
$1,072,211.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2020
August 31, 2020
Kings Hwy, New Bedford, MA
Related To This Project
New Bedford, MA
Bid Date: Jun 02 2020
New Bedford, MA
Bid Date: Dec 17 2019
New Bedford, MA
Bid Date: Jul 03 2019
New Bedford, MA
Bid Date: Apr 21 2023
New Bedford, MA
Bid Date: May 01 2023
New Bedford, MA
Bid Date: May 22 2023
New Bedford, MA
--
New Bedford, MA
--
New Bedford, MA
Bid Date: Mar 23 2021
New Bedford, MA
Bid Date: Jun 08 2021
New Bedford, MA
Bid Date: Aug 30 2022
New Bedford, MA
--
New Bedford, MA
Bid Date: Apr 21 2023
New Bedford, MA
Bid Date: Apr 21 2023
New Bedford, MA
Bid Date: Mar 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.