BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Anchorage, Alaska. Completed plans call for the renovation of a 80,000-square-foot educational facility.

The Anchorage School District is committed to providing reasonable accommodations, according to applicable state and federal laws, to all individuals with a qualifying disability. If you require a reasonable accommodation in order to participate in this or any other district process, please contact the Anchorage School Districts Compliance/Equal Employment Opportunity Office at (907) 742-4132. A. Notification of Potential Hazards: Asbestos, lead and other potentially hazardous materials are present in the building that may impact the work of all trades. Regulated air contaminants, including asbestos and lead, are also present in settled and concealed dust in and on architectural, structural, mechanical, and electrical components or systems throughout the building. All trades shall coordinate with other trades and conduct their work to prevent worker exposure or site contamination. Refer to Specification Divisions 0, 1 and 2 for specific information concerning disturbing, removing, and disposing of these materials and the installation of new materials or components. This notification is provided in accordance with EPA and OSHA requirements. B. The hazards abatement portion of this project includes the disturbance and/or removal and disposal of selected asbestos-containing materials and lead-containing materials. Th Contractor shall remove or disturb hazardous materials as coordinated with other trades, as specified and/or indicated on the drawings and as required to complete the work. Refer to the Contractor's approved work plan for hazardous materials removal, disturbance and disposal procedures. C. Quantities of ACM and hazardous materials shown on drawings are based on a comprehensive survey of the building and take-offs from scale drawings. The Hazardous Material Assessment and quantities provided are considered a baseline for bid purposes. It is the contractor's responsibility to remove and dispose of all ACMs affected by the project from the site in accordance with applicable regulations. The contractor shall immediately notify the owner if other ACM or additional quantities are discovered. Quantities of materials removed shall be documented on a daily basis and shall include all materials removed and locations, in the units used on the drawings. Unit pricing shall be provided in the bid for all identified hazardous material in case additional quantities are discovered.

Award

Educational

$3,351,202.00

Public - City

Renovation

397

22

14

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
128
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2022

March 19, 2022

img_map_placeholder

2909 W 88th Ave, Anchorage, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.