BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a civil project in Killeen, Texas. Design plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Plans call for for improvements to Chaparral Road from SH 195 to Stillhouse Lake Road (FM 3481). The area around Chaparral Road has seen a significant increase in residents, leading to congestion and safety concerns for drivers and pedestrians. Considering this growth, the newly-constructed Chaparral High School, the many planned residential developments, and the upcoming opening of a new City middle School, the City is moving the project forward. Improvements would accommodate existing and future traffic volumes and improve safety and mobility for all roadway users, including students. The Realignment between Chaparral High School and E. Trimmier Road. The Alignment B option was selected for the realignment of Chaparral Road between Chaparral High School and E. Trimmier Road. Alignment B received the most public support, it is also the most cost efficient with minimal traffic disruptions. Realignment between Rosewood Drive and FM 3481 (Stillhouse Lake Road) A third alignment option for Chaparral Road between Rosewood Drive and FM 3481 (Stillhouse Lake Road) was developed and evaluated after the public meeting to address comments received from the public and the City of Harker Heights. This third alignment option was chosen as the preferred alignment after further evaluation and considerations. This alignment option reduces the amount of proposed right-of-way acquisition west of the Trimmier Creek bridge and shifts the alignment away from residential properties east of the bridge to address noise concerns. As of November 22, 2023, the design firm has been selected. The roadway design is expected to be complete mid-2025 and construction could begin in late-2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Bridges / Tunnels

$24,000,000.00

Public - City

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
26
Bidding Soon
1,595
All Active Projects
600
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.