BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work and new construction of a mixed-use development in Joliet, Illinois. Working plans call for the construction of a 65,000-square-foot laboratory facility; 40,000-square-foot office development; for site work for a laboratory facility; and laboratory facility.

As of November 5, 2025, this project has and an estimated bid date of January 20, 2026. It's permits are ready, but plans & specifications are not ready yet. The Capital Development Board (CDB) requests qualifications from Construction Management firms to provide Construction Management Services at Agency Professional Services in connection with the above project. Firm acting as a Construction Manager (CM) must be pre-qualified with the Capital Development Board as a CM. A combined MBE/WBE goal of 20 percent is applicable to the team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). A VBE/PBE goal of 2 percent is applicable to the team. The Illinois Works Jobs Program Act Apprenticeship Initiative will apply to all prevailing wage eligible work performed on this project. Professional liability insurance required: $100,000 The Illinois State Police construction of a new approximately 105,000 square foot combined Forensic Lab and District 5 Headquarters. The facility will include approximately 65,000 square feet of lab space and approximately 40,000 square feet of office and administrative space for various units. The site will require an environmental assessment and possible mitigation. The facility must be designed and constructed to meet the minimum of LEED Silver Certification. There will be a separate commissioning authority assigned to this project Project Delivery Method: Single prime contracts with protected subs will be used on this project as required by the Illinois Procurement Code. The CM will need to assist with planning, reviewing, meeting and monitoring the project schedule and minority-owned and/or women-owned business enterprise goals (MBE/WBE) as defined in the contract documents. The coordination and monitoring of the scheduling of the work will be the responsibility of the CM.

Pre-Construction/Negotiated

Laboratories

$48,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
255
Bidding Soon
3,350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

February 23, 2026

Project location map

To Be Determined, Joliet, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.