Renovation of an educational facility in Cary, North Carolina. Completed plans call for the renovation of a 864-square-foot, one-story above grade educational facility.

Leesville Elementary School to Alston Ridge Elementary School Mobile Project Minority and women-owned businesses are encouraged to participate. The Wake County Public School System reserves the right to reject any and all bids. Work under this Section shall consist of furnishing a Construction Schedule showing in detail how the Contractor plans to execute and coordinate the Work. The Contract Schedule shall be based on and incorporate the Contract Milestone and Completion Dates specified in Article 4 of the Owner-Contractor Agreement ("Time of Commencement and Substantial Completion") and the supplemental Conditions ("Specific Dates") and shall show the order in which the Contractor shall perform the Work, projected dates for the start and completion of separable portions of the work, and any other information concerning the Contractor's Work scheduling as Owner may request. The Construction Schedule shall be in the form of a bar chart and shall consist of horizontal lines, or bars, plotted along a daily time scale. Each pay item designed in the Contractor's Schedule of Value shall be denominated as a separate activity and represented by a horizontal bar or bars on the chart. The time-scale shall indicate all required Milestone and Completion Dates as set forth in the Owner-Contractor Agreement. The horizontal bar(s) shall indicate the start and finish dates as well as the total time period of performance for each pay item activity. The Contractor shall arrange the chart so as to show the pay item activities which are necessary to fulfill each and every Milestone and Completion Date requirement. Each Work item on the bar chart, as well as being correlated to the payment document, shall be broken into reasonable work segments/activities (where practicable) with individual starting and stopping dates. As a minimum, work shall be segmented to demonstrate its relationship to the various Milestone Dates, if any. The segmented Work activities shall be cost loaded to show their dollar value as part of the entire pay item. Activity titles shall be self-explanatory; abbreviations shall be shown in the legend.

Award

Educational

$628,000.00

Public - County

Renovation

47

22

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
44
Bidding Soon
1,228
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2020

September 7, 2020

img_map_placeholder

11555 Green Level Church Road, Cary, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.