BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wichita, Kansas. Completed plans call for site work for a water / sewer project.

The project was awarded to APEX EXCAVATING LLC amount $21,098.51. The start and completion date was not determined yet. A Bid Bond in the Amount of Five Percent (5%) of the Total Bid or an Annual Bid Bond is Required Prior to Bid Opening. Bidders Are Advised to Contact the Office of the City Engineer (316-268- 4501) Should They Have Any Questions or Concerns About the Plans, Special or Supplemental Provisions, Minority Status, or the Proper Preparation of the Bid Document. The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Seth Gotchey, Project Engineer, at (316) 268-4624 or sgotchey@wichita.gov. On State/Federal-aid contracts, Contractor is required to pay Davis-Bacon wages and meet the requirements of the Davis-Bacon Wage Act for the entire project, including non-participating work. The work order on this project shall be issued 20 (twenty) calendar days after the date on which the contract for this project has been awarded to the successful bidder. The work on this project shall be completed within 20 (twenty) working days from date of beginning work and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed. This Agreement shall be construed and interpreted so as to ensure that the City shall at all times stay in conformity with such laws, and as a condition of this Agreement the City reserves the right to unilaterally sever, modify, or terminate this Agreement at any time if, in the opinion of its legal counsel, the Agreement may be deemed to violate the terms of such laws.

Award

Water / Sewer

$21,099.00

Public - City

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

15

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
16
Bidding Soon
193
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2020

August 31, 2020

img_map_placeholder

To Be Determined, Wichita, KS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.