BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a transportation facility in Midland, Texas. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.

Principal items of work are set forth in specific detail in the proposal section of these specifications; however, work items may be generally described as construction of structural foundations and engineered systems to support the addition of a Gate 6 Passenger Boarding Bridge. Work will also include other miscellaneous materials, equipment, machinery, superintendence, and labor for constructing these improvements for the Midland International Air & Space Port, Midland, Texas. A bid proposal guaranty is to accompany the bid, thereby guaranteeing the good faith of the bidder and that bidder will enter into the written contract. The guaranty is to amount to 5 percent of the total bid and must be in the form of cash or certified check, issued by a bank satisfactory to the City of Midland, or a bid bond It is the policy of MAF to practice nondiscrimination based on race, color, sex, or national origin in award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying requirements of this bid specification. These requirements apply to all bidders/offerors, including those who qualify as a DBE. DBE contract goal of 9.82 percent, has been established for this contract. Bidder/offeror shall make good FAITH EFFORTS, as defined in Appendix A, 49 CFR Part 26, to meet contract goal for DBE participation in performance of this contract. Without force or effect, Work of Project consists of the construction of structural foundations and engineered systems to support the addition of a Gate 6 Passenger Boarding Bridge at the Midland International Air and Space Port, including structural concrete piers, electrical conduit, electrical panels, high mast LED lighting, and potable water line. 1. Stage 1: Infrastructure required to be in place prior to the installation of the fixed walkway and passenger boarding bridge.. 2. Stage 2: Infrastructure afixed to the fixed walkway and passenger boarding bridge.

Award

Transportation Terminals

$585,500.00

Public - City

Renovation, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
159
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.