EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2020 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in New Haven, Connecticut. Completed plans call for the renovation of a educational facility.

Provide LED Lighting replacement for existing at 6 selected Schools Coop Arts & Humanities High School - 177 College St. Wilbur Cross High School - 181 Mitchell Drive Edgewood Magnet School - 737 Edgewood Ave. Fair haven School - 164 Grand Ave. Mauro/Sheridan Magnet School - 191 Fountain St. Wexler/Grant School - 55 Foote St. Questions Due Date: Aug 12th 2020, 5:00 PM EDT

Post-Bid

Educational

$80,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Transformers

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
275
Bidding Soon
4,903
All Active Projects
2,112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2020

September 25, 2020

img_map_placeholder

Multiple Locations, New Haven, CT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

LED Replacement Project for 6 Schools

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.