Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a service station / car wash facility in Greenville, North Carolina. Completed plans call for the construction of a 21,000-square-foot service station / car wash facility; and for site work for a service station / car wash facility.
The Greenville Utilities Commission, Greenville, North Carolina ("GUC") is seeking to hire a qualified Design Build team to provide design and general contracting services for a Fleet Maintenance Building to be located at 721 Utility Way, Greenville, NC 27834. This solicitation is being made pursuant to NCGS 143-128.1B,b purpose of this solicitation is to receive RFPs from qualified DB Firms to deliver and complete design services based on the existing 35% criterion document (included in this advertisement), to provide pre-construction service and construction delivery services in accordance with the North Carolina Design-build Bridge construction delivery method. The work includes but is not limited to design development, construction documents, cost estimating; constructibility review; advanced material procurement projections; site access/utilization; and construction project scheduling and construction delivery. The scope of work for DB services required is described further in this document. The Fleet Maintenance Building will facilitate the day-to-day and emergency activities of GUC's fleet management division. Approximately 21,000 square feet of office space, maintenance shop bays, storage, warehousing and related structures are contemplated with an expected employee occupancy of 12 persons. Inquiries on the project or requests for additional information must be E-mailed to: Cleve Haddock, CLGPO, haddocgc@guc.com, Procurement Manager no later than Monday, August 10 at 5:00 p.m. local time. Greenville Utilities Commission will not be responsible for or bound by any oral instructions made by any employee(s) of GUC regarding this RFP invitation. GUC has adopted an Affirmative Action and Minority and Women Business Enterprise Plan (M/WBE) Program. Firms submitting a proposal are attesting that they also have taken affirmative action to ensure equality of opportunity in all aspects of employment, and to utilize M/WBE suppliers of materials and/or labor. Construction for the project is anticipated to begin early Spring 2021 and to be substantially complete within 12 months of the starting date. GUC reserves the right to reject all proposals or accept such proposals, as appears in its own best interest, and to waive technicalities or irregularities of any kind in the proposal. GUC is not obligated to accept the lowest cost proposal. This solicitation is being made pursuant to NCGS 143-128.1B,b purpose of this solicitation is to receive RFPs from qualified DB Firms to deliver and complete design services based on the existing 35% criterion document (included in this advertisement), to provide pre-construction service and construction delivery services in accordance with the North Carolina Design-build Bridge construction delivery method. The work includes but is not limited to design development, construction documents, cost estimating; constructibility review; advanced material procurement projections; site access/utilization; and construction project scheduling and construction delivery. The scope of work for DB services required is described further in this document. The Fleet Maintenance Building will facilitate the day-to-day and emergency activities of GUC's fleet management division. Approximately 21,000 square feet of office space, maintenance shop bays, storage, warehousing and related structures are contemplated with an expected employee occupancy of 12 persons. The overall project budget is $7,000,000.
Award
Service Station / Car Wash
$794,636.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 17, 2020
December 21, 2020
721 Utility Way, Greenville, NC
Related To This Project
Greenville, NC
--
Greenville, NC
--
Greenville, NC
--
Greenville, NC
Bid Date: Aug 05 2024
Greenville, NC
--
Greenville, NC
Bid Date: Jul 17 2024
Greenville, NC
--
Greenville, NC
Bid Date: Aug 13 2024
Greenville, NC
Bid Date: Dec 09 2021
Greenville, NC
Bid Date: Dec 07 2021
Greenville, NC
Bid Date: Oct 18 2024
Greenville, NC
--
Greenville, NC
--
Greenville, NC
--
Greenville, NC
Bid Date: Sep 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.