BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a military facility in Marietta, Georgia. Completed plans call for the demolition of a military facility; for the renovation of a military facility; and for site work for a military facility.

2019-171 Magnitude is Between $500,000 and $1,000,000 This project is a repair and construction project to renovate the old RAPCON facility for conversion to a mail handling area and office space for the radar repair team. The primary scope of this project is to renovate the existing 557 building including mechanical, electrical, and plumbing, as well as demolition of old surrounding radar facility buildings and grounds. This project will include demolition of building 545, 545a, fuel tank, inground fuel tank, removal of (2) tress, and foundations to old buildings 557B, 557C, and miscellaneous concrete structures. The exterior of the building will receive a new standing seam gable roof built on top of the existing roof. The building's exterior work includes repair and replacement of some of the building's exterior skin and replacing all windows and doors. The interiors of the existing building 557 will be re-finished and modifications to existing layout will be made to meet accessibility requirements. The purpose of this Amendment is to incorporate the following: 1. Previously submitted Questions and Answers (ATTACH 5) 2. 2005 Asbestos Report (ATTACH 6) 2. Delete Drawing A-601 and replace with Drawing A-601 Revision 1 (ATTACH 7) 3. Delete Submittal Register and replace with Submittal Register Version 002 (ATTACH 8) 4. Add Specifications 08 51 13 (ATTACH 9), 08 81 00 (ATTACH 10) and 07 42 43 (ATTACH 11) 5. Delete Specification 07 41 13 Metal Roof Panels, replace with Specification 07 61 14.00 20 Standing Seam Roofing (ATTACH 12) 6. Delete Table of Contents and replace with TOC Version 002 (ATTACH 13) 7. Incorporate Dobbins Design Guide dated October 2022 (ATTACH 14) . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 2. You must also submit your Full Name, Date of Birth and Company, to the POC's listed below, no later than three (3) calendar days prior to the scheduled site visit. Failure to submit information may result in denial of base access for the site visit. Requests for attendance shall be forwarded to Kevin Song at kevin.song@us.af.mil and Kenneth Jacob at kenneth.jacob.1@us.af.mil. The Government is not responsible for electronic transmittal failures. 3. Any questions generated from the site visit must be submitted in writing to Kevin Song at kevin.song@us.af.mil and Kenneth Jacob at kenneth. jacob.1@us.af.mil. NLT 4:00 PM, 22 March 2023. The Contracting Officer will provide clarification(s) through amendment(s) to the solicitation following receipt of any questions. Any questions received after 4:00 PM, 22 March 2023 may or may not be answered. Submission of questions prior to the site visit is also encouraged. 4. All vehicles are subject to search and should have on their person a valid driver's license, vehicle registration, and current proof of insurance. Offerors should allow sufficient time. Project no - P15PC00467,0220012

Post-Bid

Military

$1,000,000.00

Public - Federal

Demolition, Renovation, Site Work

43

24

2

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
50
Bidding Soon
1,469
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

June 12, 2023

img_map_placeholder

1291 Cobb Pkwy SE, Marietta, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.