EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2020 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Dekalb, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and water / sewer project.

City/county Dekalb Concrete Box Culverts 167.5 Cy; Reinforcement Bars Epoxy Coated 46,000 Lb; Storm Sewers Ci a Ty 1 15 115 Ft; Earth Excavation (Special) 341 Cy; Furnished Excavation 228 Cy; Aggregate Subgrade Improvement 12 283 Sy; Hma Binder Course 84 Ton; Hma Surface Course 25 Ton. Project Location: South First St at Gurler Rd on the South West Side of Dekalb, Il in Dekalb County Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. IDOT - Concrete Box Culverts, Reinforcement Bars Epoxy Coated, Storm Sewers, HMA Surface Course - 19-00267-00-BR

Award

Bridges / Tunnels

$401,079.00

Public - County

Paving, Site Work

25

1

5

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
120
Bidding Soon
2,413
All Active Projects
1,047
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2020

September 4, 2020

img_map_placeholder

S 1st St, Dekalb, IL

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

South First Street Structure Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.