BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a civil project in Silver City, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

Termini: I-10, MP 21.500 to MP 25.000 for 3.500 miles County: Hidalgo (District 1) Type of Work: Roadway Reconstruction, Bridge Replacement, Roadway Rehabilitation, Lighting Contract Time: 200 Working Day Dbe Goal: At this time NMDOT will meet the State DBE on Federally assisted projects through a combination of race- neutral and race-conscious measures. This project is subject to race-conscious measures. Licenses: (GA-1 or GA-98) and (GF-2 or GF-98) and (EE-98) Funding Type: Federal-aid Listing Threshold: $5,000.00 (Subcontractors Fair Practices Act Compliance) Wage Rate (Federal): NM20200036 Wage Rate (State): Type "a" As a condition to submitting a Bid all Bidders bidding as Contractors are required to be prequalified with the NMDOT's Office of Inspector General seven (7) Days before Bid Opening per 18.27.5 NMAC. All Subcontractors are required to be prequalified before performing any Work and prior to supplying goods or services to the Project. The Bidder's prequalification factor rolling average will be applied to any Project with an engineer's estimate greater than $5 million. All Bidders submitting Bids valued over sixty thousand dollars ($60,000.00) shall be registered with the Department of Workforce Solutions (DWS), Labor Relations before Bidding. The Bidder's registration number shall be included on the Bid Form. If a Bidder appears on the DWS list of willful violators of the Public Works Minimum Wage Act (NMSA 13-4-14), the NMDOT shall reject the Bid and shall continue to reject Bids from that Bidder for three years after the date of publication of the list. The Bidder's Bid Guaranty shall be five percent (5%) of the Bidder's Total Bid Amount and shall be submitted before Bid Opening through either Surety 2000 or Surepath Network. Failure of the Bidder to comply with this Advertisement shall render the Bid non-responsive and the Bid shall be rejected. NM DOT - Call 01 - I-10 - Roadway Reconstruction, Bridge Replacement, Roadway Rehabilitation, Lighting

Award

Roads / Highways

$10,340,173.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
20
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2020

February 16, 2021

img_map_placeholder

I-10, Silver City, NM

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.