BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Wheaton, Illinois. Completed plans call for site work for a bridge / tunnel.

The work to be done for this project, shown on the Drawings entitled, "Mallard Lake Service Bridge Repair," prepared by the Forest Preserve District of DuPage County and H.W. Lochner, Inc. consists of repairing an abutment on the Service Bridge in Mallard Lake Forest Preserve over the West Branch of the DuPage River. Project will include temporary shoring of the bridge, removal of the damaged sections of the abutment and the pouring of replacement portions of the abutment. A properly certified check, bond draft, cashier's check or bid bond payable to the FOREST PRESERVE DISTRICT OF DUPAGE COUNTY for not less than ten percent (10%) of the amount of the grand total bid shall be submitted with each bid. The bid security shall be forfeited if the lowest responsible bidder awarded the contract fails, or refuses, to (a) enter into a Contract; (b) furnish performance and labor and material payment bonds equal to 100% of the contract amount; (c) furnish a construction schedule; or (d) provide the required insurance information after the successful bidder's bid submittal is accepted. Deadline for Questions / Request for Information 08/04/2020 5:00 PM Via e-mail to:cwelch@dupageforest.org Or phone 630-871-6411 Before final payment is made the Contractor shall furnish a maintenance bond to the Owner in a sum equal to ten percent (10%) of the final Contract Price. It is anticipated that the contract will be considered for award on September 1, 2020. Contractor shall complete all the items on or before Final Completion date of December 15, 2020. In the event that the Contractor does not correct the violation within 48-hours after receipt of written notice, the Owner shall withhold as liquidated damages $1,000 for each day of noncompliance from the contract amount. Time extensions for correcting the violation shall only be given by written consent of the Owner. The Owner reserves the right to stop any, and all, construction activity at the site until the Contractor corrects the violation. The Owner reserves the right to reject any and all bid submittals, to waive informalities or technicalities in any Bid, and to award the Contract in the best interest of the Owner and the Public.

Award

Bridges / Tunnels

$65,320.00

Public - County

Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
84
Bidding Soon
1,849
All Active Projects
802
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2020

September 15, 2020

img_map_placeholder

To Be Determined, Wheaton, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.