BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in El Cajon, California. Completed plans call for the construction of a two-story above grade educational facility; and for site work for a educational facility.

As of August 6, 2024, project is expected to bid first quarter 2025 and start construction June 2025. SEE ALSO: Cuyamaca College Instructional Building F2 Renovation and Expansion Building A - Grossmont-Cuyamaca CCD As of March 21, 2024, Bldg. F2 Reno/Expan Bldg. A will start construction September 2024, complete June 2025 and construction cost estimate is $9.2 million. For Instructional Bldg. F, construction will start June 2025 and complete May 2027 and is valued at $33 million. As of October 4, 2022, a construction manager and an architect have been identified. Per the construction manager, construction is anticipated to begin in April 2024. Original solicitation description: Cuyamaca College Instructional Building F (1) Instructional Building F (2) The 1978 constructed Building F complex is a series of row buildings tied together through a common corridor system and includes three smaller adjacent stand-alone buildings. The complex houses general education and technical education academic programs. The Building F complex was modern when constructed but now 40 years later cannot support the technological advancements and other facility requirements in demand by students and faculty. The Master Plan is for the entire Building F complex to be demolished and replaced. Two new 2-story instructional buildings are planned to be built in its place. Construction of these buildings is planned to run concurrently but require designation as individual projects based on divergent funding sources. Complete separate drawing and specification packages will be required for each building. Instructional Building F (1) will be funded 50% by the State and 50% by local Proposition V funding. This funding covers complete demolition of the existing Building F complex and the construction of one new instructional building. Construction of the new Instructional Building F (2) will be funded fully by local Proposition V funds and or other sources.

Award

Educational

$42,200,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
28
Bidding Soon
819
All Active Projects
371
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

900 Rancho San Diego Pkwy, El Cajon, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.