BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in East Watertown, Massachusetts. Completed plans call for site work for a water / sewer project.

Contractor Qualification Highway Division CIP Project 1A Rehabilitations, Contract No. 20-01S Open cut repair of 751 l.f. of sewer, replacement of 21 sewer service connections, installation of 10 sewer manholes, open cut repair of 407 l.f. of drain, installation of 15,597 l.f. of cured-in-place pipe etc. Open cut repair of 751 l.f. of sewer, replacement of 21 sewer service connections, installation of 10 sewer manholes, open cut repair of 407 l.f. of drain, installation of 15,597 l.f. of cured-in-place pipe and reinstatement of 312 services, installation of 4,632 l.f. of structural cured-in-place pipe and reinstatement of 88 services, cutting 45 protruding service connections, cementitious lining of 936 v.f. of manholes, installation of eight (8) manhole frame and covers, building of seven (7) manhole bench and inverts, and cleaning and inspection of 235 l.f. of sewer The work must be brought to substantial completion, exclusive of final paving and warranty re-test inspection, within 270 calendar days of the start date fixed in the "Notice to Proceed." The Contractor shall complete warranty re-test inspection within 50 calendar days of the commencement of the warranty re-test inspection. Time is of the essence in the performance of the work of this contract. Bidders attention is directed to the provisions in the Project Manual regarding the assessment of liquidated damages for failure to complete the work within the time specified. The Bidder further agrees to pay as liquidated damages the sum of $1,450.00 for each consecutive calendar day thereafter during which the work has not been fully completed, as provided in the "Liquidated Damages" provisions of Section 0800 SUPPLEMENTARY CONDITIONS. Liquidated damages shall also apply to the warranty re-test durations. The Bidder shall make positive efforts to achieve: (1) a minority employee work force goal of 15.30 percent, (2) a woman employee work force goal of 6.90 percent, (3) a goal of 7.24 percent participation of Minority-owned Business Enterprise(s), and (4) a goal of 3.60 percent participation of Woman-owned Business Enterprise(s) within project contracts.

Award

Water / Sewer

$1,747,403.00

Public - City

Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
155
Bidding Soon
2,894
All Active Projects
1,204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2020

October 19, 2020

img_map_placeholder

Multiple Locations, East Watertown, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.