BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Jacksonville, North Carolina. Conceptual plans call for site work for a water / sewer project.

Update FY21: Recent funding challenges have caused NCDOT to delay projects. This utility project will be delayed to correspond with the NCDOT project. The Brynn Marr Area Stormwater Project Phase II consists of improving open drainage channels, piped facilities, and areas to retain stormwater runoff. This includes stormwater facilities in the areas of Brynn Marr Road, Liberty Drive, Western Boulevard and NC24. Flooding in this area has affected both personal property and arterial roadways causing significant travel delays on both Western and NC24. Based on the initial study, the drainage beneath NC24 at Western Blvd needs to be improved to make the City's project successful. To that end and to also alleviate periodic flooding in proximity to the NC24-Western Blvd intersection, a NCDOT project to construct a culvert beneath NC24 is planned which will be capable of conveying runoff from a 50-year storm either alone or in conjunction with other existing pipes and culverts. Update: The schedule for the NCDOT project (TIP No. U-5508) has changed since the FY15 CIP. The initial design of this project has been abandoned in part due to the large number of utility conflicts. As a result, NCDOT is currently evaluating several other design options with anticipation of letting the project in 2022. As of July 13, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$824,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
65
Bidding Soon
829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2026

Project location map

Multiple Locations, Jacksonville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.