BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tempe, Arizona. Design plans call for site work for a water / sewer project.

As of October 30, 2023, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: This is the highest ranked project in the Tempe Drainage Master Study. the project requires participation from the City of Tempe and the City of Scottsdale. The project will focus on increasing the stormdrain capacity and increasing the capture capacity to provide relief for areas of current and potential future flooding. The proposed Roosevelt Street stormdrain is an extension of the existing 78-inch stormdrain that outlets to IBW at Roosevelt Street. New stormdrains are also proposed to capture the flows in the east-west streets north of Roosevelt Street/Continental Drive (in Scottsdale), including new laterals in 74th Street., 70th Street, and 68th Street. A fourth lateral is proposed at the west end of Continental Drive, through Supai Middle School, to intercept the 100-year, 6-hour peak discharge that is released through the 42-inch culvert underneath the Crosscut Canal. In addition to the proposed lateral stormdrains, inlets will also be added along Roosevelt Street/Continental Drive at the upstream side of intersecting streets to collect runoff before it can leave the roadway gutter and flow to the south, improving drainage conditions for the neighborhood areas south of Continental Dr./Roosevelt St. All written questions submitted no later than January 31, 2023, by 4:00 p.m., Arizona time Any question(s) related to this procurement shall be in writing and submitted no later than the date and time listed below to jennifer_svetichan@tempe.gov. Any questions submitted after this deadline will not be considered. RFQ holder registration no later than February 3, 2023 Interview(s) Week of February 27, 2023 Scope meeting Week of March 13, 2023 The method of contractor selection has not been determined at this time.

Design

Water / Sewer

$9,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
22
Bidding Soon
713
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

img_map_placeholder

S Roosevelt St, Tempe, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.