BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2022 at 7:00 PM

Updated February 4, 2025

Site work and new construction of a municipal facility in Chippewa Falls, Wisconsin. Completed plans call for the construction of a municipal facility.

This project is being letusinga new single primebidding andcontractingprocess. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first.Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP 30bids will be rejected.The state will enter into a single contract with the lowest, qualified, responsible, 31certified general prime contractor and thisgeneral prime contractor will enter into subcontracts with the successful MEP bidders In general, the work consists of constructing a new stand alone, 5,280 square foot, single story, wood and masonry facility maintenance structure with pitched, shingled roof areas over wood trusses. The structure houses office space, break room and toilets rooms, storage spaces, mechanical mezzanine and vehicle service bays. Vehicle service bays to have overhead doors and sit adjacent a new outdoor fenced in compound area. There will be no pre-bid tour. Base Bids will be received as a single lump sum bid for: 3) Plumbing; 4) Mechanical (Heating,1Ventilating, Air Conditioning); and 5) Electrical. Bid Result PLUMBING - Hooper Corporation - 88,340 HVAC - Wisconsin Mechanical Soluctions - 105,000 ELECTRICAL - Hudson Electric, Inc. - 80,300 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. fully complete all the work within 427 consecutive calendar days thereafter.

Award

Municipal

$354,438.00

Public - State/Provincial

New Construction, Site Work

51

24

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
51
Bidding Soon
519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2022

March 1, 2022

Project location map

2811 E Park Ave, Chippewa Falls, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.