BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a bridge / tunnel in Naper, Nebraska. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

Each bidder will be required to submit with his proposal a Bid Bond or Certified Check made payable, without condition, to the County Treasurer of Holt County, Nebraska, in an amount equal to five (5) percent of his proposal. The bidder to whom the contract is awarded shall furnish within ten (10) days after the award a surety bond or bonds in a sum equal to the full amount of the contract. The form of the bonds and surety shall be acceptable to the Holt County Board of Supervisors. The bidder will include an estimated time of beginning and completion for the project with the proposal. The final completion date for the project is April 1, 2021. The contractor will be allowed 160 calendar days for the completion after beginning the work. The completion date provided in the proposal, if sooner than the completion deadline, will supersede the April 1, 2021 completion date and replace that date as the new completion deadline. The Board of County Supervisors will include the project completion dates in the proposals as an indicator in selection and award of the contract. The Board of County Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids. Awarding of the Contract will be in accordance with the eleven points enumerated under "Competitive Bidding; Consideration", COUNTY PURCHASING ACT, N.R.S. Sections 23-3101 through 23-3114 and any competitive bidding requirements of Nebraska Statutes 16-321, et. seq., and the Holt County Board of Supervisors will, at their discretion, award based on the lowest or best bid. REMOVAL OF - STRUCTURE NO. C004521725 STA. 1035+35, LT & RT and STA. 1035+60, LT & RT Remove and Reset 20 Linear Foot of Fence STA. 1039+79, RT Removal of 523'-10" Steel Multi-Girder Bridge Superstructure

Award

Bridges / Tunnels

$636,155.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
33
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2020

September 30, 2020

img_map_placeholder

To Be Determined, Naper, NE

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.