Site work for a water / sewer project in Waldorf, Maryland. Conceptual plans call for site work for a water / sewer project.
Update:https://www.charlescountymd.gov/home/showpublisheddocument/28794/638948309579170000 As recommended in the Waldorf Urban Redevelopment Corridor Implementation Study, the waterline along Old Washington Road will be replaced to increase water distribution capacity, increase re ow, and remove the existing aging infrastructure. This water line will extend from MD 5 Business to Substation Road, which will also allow greater distribution of the water from the Pineeld water tower. Using $350/LF for waterline construction and appurtenances (12,800 lf total). Project is included in Charles County Fiscal Year 2026-2030 Page no 322 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.charlescountymd.gov/home/showpublisheddocument/16548/638338187929330000 As recommended in the Waldorf Urban Redevelopment Corridor Implementation Study, the waterline along Old Washington Road must be replaced to increase water distribution capacity, increase fire flow, and remove the existing aging infrastructure. This water line will extend from MD 5 Business to Substation Road, which will also allow greater distribution of the water from the Pinefield water tower. Project funding is being updated after completion of design. Project is included Charles County Fiscal Year 2024-2028 Page no 79 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.charlescountymd.gov/home/showpublisheddocument/16548/638338187929330000 As recommended in the Waldorf Urban Redevelopment Corridor Implementation Study, the waterline along Old Washington Road must be replaced to increase water distribution capacity, increase fire flow, and remove the existing aging infrastructure. This water line will extend from MD 5 Business to Substation Road, which will also allow greater distribution of the water from the Pinefield water tower. Project funding is being updated after completion of design. Project is included Charles County Fiscal Year 2024-2028 Page no 437 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- As recommended in the Waldorf Urban Redevelopment Corridor Implementation Study, the waterline along Old Washington Road must be replaced to increase water distribution capacity, increase fire flow, and remove the existing aging infrastructure. This water line will extend from MD 5 Business to Substation Road, which will also allow greater distribution of the water from the Pinefield water tower. As of August 18, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2027. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$3,430,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2029
Old Washington Rd, Waldorf, MD
Related To This Project
Waldorf, MD
Bid Date: Sep 01 2022
Waldorf, MD
--
Waldorf, MD
Bid Date: Sep 16 2022
Waldorf, MD
Bid Date: Apr 07 2022
Waldorf, MD
Bid Date: Jan 17 2023
Waldorf, MD
Bid Date: Sep 03 2020
Waldorf, MD
Bid Date: Feb 23 2023
Waldorf, MD
Bid Date: Mar 06 2025
Waldorf, MD
Bid Date: Mar 25 2026
Waldorf, MD
--
Waldorf, MD
Bid Date: Apr 11 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.