Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Winston Salem, North Carolina. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; and sidewalk / parking lot.
Brushy Fork Park - Site & amenity construction at 4.28 acre park north of NC Hwy 421. Renovations include: 0.21 acres of disturbance in and around existing shelter and east end of parking area; remove and replace existing play structures with new equipment, engineered mulch; concrete border and underdrains; remove existing asphalt path and provide new ADA concrete walk to relocated playground and existing Shelter; add two new concrete ADA parking spaces, storm drainage and new shade tree. Winston Lake Park - Site & amenity construction at this 229 acre park. Shelter #1 renovations include: 0.50 acres of disturbance in and around existing shelter 1 and existing playground area; remove and replace existing play structures with new equipment, engineered mulch; concrete walks and underdrains; remove existing asphalt paving concrete walks, paving and provide new circular concrete walk around playground and connect to existing shelter; add storm drainage; install new native flowering and shade trees. Shelter #3 renovations include: 0.25 acres of disturbance in and around existing shelter 3 and existing playground area; remove and replace existing play structures with new equipment, engineered mulch; concrete walks and underdrains; remove fencing and drainage; provide ADA concrete walk access and walk/steps from parking to playground and connect to existing shelter; add storm drainage, flowering tree and riverstone. Shelter #4 renovations include: 0.15 acres of disturbance in and around existing shelter 4 and existing playground area; remove and replace existing play structures with new equipment, pip surfacing; concrete walks, steps and underdrains; remove existing concrete walks, paving and provide new ADA concrete walk from parking to connect to existing shelter & new playground; add fencing, storm drainage, groundcover, reinstall benches and grill. Subcontracting trades identified are as follows: Removal and Disposal of old equipment Excavation and Installation of new Engineered Mulch Play Surface & Underdrains Installation of New Poured in Place (P.I.P) Play Surfacing & Underdrains Site work including Clearing & Grubbing, Demolition, Erosion Control and Grading Storm Drainage & Piping Asphalt Paving Aggregate Base Course Paving Concrete Curbing/Border Concrete Paving Permanent Seeding Landscaping and Mulching For technical questions regarding this project, please submit questions in writing to Darren Redfield at darrenmr@cityofws.org for response to all by addendum. End of Question Period is 5:00 PM, August 26, 2020. Bidders are hereby notified that they must be properly licensed as required by Chapter 87 of the North Carolina General Statutes. Construction time: ~November 16, 2020 to May 31, 2021 (190 calendar days). M/WBE goals apply. Minority and Women Business Enterprise goals apply: 6% MBE, 6% WBE The City reserves the right to waive any informalities in the bidding and to reject any or all proposals.
Award
Playgrounds / Parks / Athletic Fields
$699,573.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to five free projects and companies, then subscribe for complete access to all contacts and documents. Unlock new opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 3, 2020
November 16, 2020
Multiple Locations, Winston Salem, NC
Related To This Project
Winston Salem, NC
Bid Date: Jul 16 2020
Winston Salem, NC
Bid Date: Jun 09 2020
Winston Salem, NC
Bid Date: Jan 07 2021
Winston Salem, NC
Bid Date: Oct 10 2019
Winston Salem, NC
Bid Date: Sep 10 2020
Winston Salem, NC
Bid Date: Mar 20 2019
Winston Salem, NC
Bid Date: Jul 08 2020
Winston Salem, NC
Bid Date: Apr 03 2019
Winston Salem, NC
Bid Date: May 20 2021
Winston Salem, NC
Bid Date: Sep 09 2021
Winston Salem, NC
Bid Date: May 08 2024
Winston Salem, NC
Bid Date: Apr 16 2024
Winston Salem, NC
Bid Date: May 02 2024
Winston Salem, NC
Bid Date: May 07 2024
Winston Salem, NC
Bid Date: Apr 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--