Published December 7, 2022 at 7:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Dickson City, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; water / sewer project; road / highway; and for paving for a road / highway.

As of November 01, 2022, this project has not yet been awarded. A timeline for award has not yet been established. DICKSON CITY BOROUGH RIVERFRONT PARK DEVELOPMENT PROJECT a) Demolition and site clearing. b) Demolition, rough grading, and soil removal and remediation. c) Existing electric lighting system evaluation and adjustments. d) Construction of asphalt parking area with line painting. e) Purchase and construction of split rail fence. f) Purchase and construction of dog park area, fence, and frost free yard hydrants. g) Construction of picnic area(s). h) Construction of gravel (add alt asphalt) boat access drive. i) Construction and installation of pre-cast boat launch and boot cleaning station. j) Installation of gravel perimeter trail and bollards. k) Purchase and installation of stream bank seeding and mulch. l) Purchase and installation of rain garden and rain garden sign. m) Purchase and installation of park sign. n) Purchase and installation of river access sign. o) Installation of various park amenities provided by the owner (picnic tables, benches, trash receptacles, bike racks) p) Installation of the Composting Restroom (Clivis Multrum) q) Installation of lighting system, footings, and hardware. r) Installation of owner supplied light fixtures. s) Final site grading, seeding, mulching, and stabilization. t) Installation and removal of erosion and sediment control items as required under approved permits. a) Installation of stormwater management facilities and temporary erosion and sediment control measures per a PA DEP NPDES Chapter 102 permit b) Installation of required signage. c) Removal of existing compact gravel parking area and installation of a new parking area with ADA accessible parking. d) Removal of existing chain-link fencing and installation of new split rail fencing. e) Removal of selected vegetation and installation of topsoil, seeding, and other specified vegetation . f) Removal and salvage of existing electric lighting system and installation of new electric runs, light foundations, and control boxes. g) Installation of ADA accessible pedestrian routes h) Installation of a prefabricated comfort station (composting restroom). i) Installation of a dog park area including fencing and waste receptacle(s). j) Installation of various site furnishings including benches, picnic tables, trash receptacles. k) Installation of various utility laterals and supply points l) Installation of a pre-cast concrete boat launch. m) Coordinate with Owner for delivery and assembly of site furnishings, such as composting restroom facility, pre-cast boat launch ramp, and site furnishings. The bid must be accompanied by a bid guarantee in an amount not less then ten percent (10%) of the amount of the base bid submitted. This sum will serve as a bid security and will be forfeited to Dickson City Borough as liquidated damages in the event that an award is made, and the contract and bonds are not promptly executed as required in the contract documents for required bonds and insurance coverage. This project is subject to the labor standards as required by the Pennsylvania Prevailing Wage Act #442 and reference is made to prevailing wage rates applicable to this project and which have been included as part of this project. Where a particular craft is not listed in the prevailing wage rates, the contractor shall contact the Department's rate determination department to determine the rates that will apply to satisfy the Act's Requirements. This project is subject to the labor standards as required by the Davis Bacon Wage Act and reference is made to prevailing wage rates applicable to this project as determined by the Secretary of Labor, U.S. Department of Labor and which have been included as part of this project. Where a particular craft is not listed in the Davis Bacon wage rates, the contractor shall contact the Davis-Bacon Wage rate determination Department to determine the rates that will apply to satisfy the Act's Requirements. No bid may be withdrawn for a period of sixty (60) days after the date specified for opening and reading of the bids, except as provided in accordance with the Pennsylvania Act No. 4 as approved on January 23, 1974. Dickson City Borough reserves the right to reject any and all proposals and to waive any technical defects and irregularities. CLARIFICATION DEADLINE 10/11/2022 12:00 PM The CONTRACTOR will commence work as required by the CONTRACT DOCUMENTS within ___7__ calendar days after the date of the NOTICE TO PROCEED and will complete the same within __150___ calendar days unless the period for completion The bid award date is currently November 1, 2022.

Award

Playgrounds / Parks / Athletic Fields

$523,322.00

Public - City

Outdoor Lighting, Paving, Site Work

22

30

15

7

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Transfer Switches, Automatic Transfer Switches, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
121
Bidding Soon
1,645
All Active Projects
717
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 17, 2022

img_map_placeholder

Enterprise St, Dickson City, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Riverfront Park Development Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.