BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Delray Beach, Florida. Completed plans call for the renovation of a educational facility; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

The construction manager shall provide all preconstruction phase services necessary to establish a gmp as well as all construction phase services following award of the gmp for the school identified in this project notification. The construction manager may be required to complete portions of the construction on an occupied campus as directed by the owner. The construction manager shall provide deferred maintenance, renovation and repairs to school facilities which may include, but not be limited to, ada and csir compliance requirements, replacement of exterior doors and windows, roof repair, upgrades to the intercom/sound system, security system, fire alarm system, hvac system, lighting replacement (interior and exterior), paving and play court resurfacing, marquees and scoreboards, plumbing work, bathroom replacements, ceiling and flooring replacements, interior finishes/painting/casework, and other work as may be required by the owner. Construction shall incorporate all of the requirements set forth in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC) Chapter 6A-2 and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project Documents in accordance with the requirements stated in Department of Education's Chapter 6A-2, SREF and FAC. Q & A deadline: Sep 23, 2020 2:00:00 PM EDT Construction schedule : Construction for the school will be phased. Each construction phase for the school will have a substantial completion date required by the owner however, all work for the school must be substantially and finally completed on the following dates: Substantial completion: july 20, 2023 Final completion: october 20, 2023 Established project budget for construction: $4,357,160

Award

Educational

$4,357,160.00

Public - County

Paving, Renovation, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
66
Bidding Soon
1,178
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2020

June 4, 2021

img_map_placeholder

6201 Morikami Park Rd, Delray Beach, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.