EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 29, 2021 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Washington, District of Columbia. Contact the soliciting agency for additional information.

*Contract Award Date: Mar 24, 2021 Contract Award Number: AOCACB21D0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 187661467 Contractor Awarded Unique Entity ID (SAM): PY8EUERLAA35 Contractor Awarded Name: NICHOLS CONTRACTING, INC. Contractor Awarded Address: Sandy Spring, MD USA Base and All Options Value (Total Contract Value): $120000.00 The Architect of the Capitol (AOC) anticipates issuing a Request for Proposal (RFP) for construction services under Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Job Order Contract (JOC). This is a standalone contract to provide rapid, smaller dollar-value (less than $1,000,000) construction services. The comprehensive scope of the construction services shall include (but not be limited to) the following: 1. MEP/HVAC 2. Emergency Power 3. Elevator I Escalader 4. Concrete 5. Fire Alarm and Fire Sprinkler 6. HAZMAT Remediation 7. Demolition 8. Roofing 9. Stone and Facade Restoration 10. Painting 11. Office Restoration I Fit Out Details on the required services will be provided in individual Task Orders (TO). Detailed information on required qualifications and past experience will be contained within each task order solicitation documents. The awarded contract will include various construction services with the period of performance for base services at 365 days from contract award. This IDIQ shall include one Base Period and four Option Periods. Options for the IDIQ may be exercised at any time prior to the expiration of the Base Period or the current Option Period. The period of performance for the Base and Option Periods shall be as follows: Base Period: March 1, 2021 - February 28, 2022 Option Period 1: March 1, 2022 - February 28, 2023 Option Period 2: March 1, 2023 - February 29, 2024 Option Period 3: March 1, 2024 - February 28, 2025 Option Period 4: March 1, 2025 - February 28, 2026 The cumulative amount of all task orders issued against this IDIQ contract shall not exceed $10,000,000 per awardee. The AOC anticipates selecting approximately three (3) awardees but reserves the right to select more or less depending on the quality of proposals. Each Task Order amount is expected to be between $1,000 and $1,000,000. The AOC anticipates this procurement to be a Small-Business Set Aside. Additionally, a One-Step, Best Value Trade-Off process will be utilized as the vehicle for this procurement. This RFP and any subsequent amendments will be issued in electronic format only and will be available on or about October 1, 2020 on the Contract Opportunities (formerly Federal Business Opportunities) website at beta.SAM.gov. Please be advised the date for solicitation posting is estimated and the actual posting date may be after the aforementioned estimated date. The anticipated award date is February 28, 2021. Please address all questions in writing to John Lingamfelter, Contracting Officer, via email at john.lingamfelter@aoc.gov. Telephone inquiries will not be accepted.

Award

Military

$120,000.00

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Restrictions, Price and Payment Procedures, Value Analysis, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Photographic Documentation, Submittal Procedures, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Polychlorinate Biphenyl Remediation
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Roof Tiles, Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Bases, Ballasts, and Paving, Unit Paving, Stone Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Subdrainage, Electrical Utilities, Utility Transformers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
76
Bidding Soon
1,964
All Active Projects
826
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2020

March 1, 2021

img_map_placeholder

Multiple Locations, Washington, DC


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Architect of the Capitol Job Order Contract (JOC)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.