Published November 19, 2020 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Biloxi, Mississippi. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of November 19, 2020, the project has not been awarded. A timeline for the award is not yet determined.** Work on which proposals are invited consists of constructing approximately 2,500 linear feet of 4-lane boulevard and sitework along Division Street Gate from Forrest Avenue east to 1-110. Also included in the project scope is earthwork, storm drainage, minor water and sewer piping, 350 LF of triple 10' x 6' box culvert, curb and gutter, asphalt paving, installation of traffic signals, cast-in-place duct bank and other related work. The maximum time allowable for completion of said project is 350 calendar days following the CITY'S written order to commence (Notice to Proceed). The successful bidder will be required to furnish a 100% Payment and Performance Bond if the bid equals or exceeds $25,000. If the bid is less than $25,000, the City of Biloxi may elect to make a lump sum payment at the completion of the job, in which case a payment and performance bond shall not be required. Proposals must be accompanied by a Proposal Guaranty consisting of a Bid Bond, Cashier's Check or Certified Check in the amount of 5% of the amount of the bid. All persons having a contract with the City of Biloxi must adhere to the City's policy concerning non-discrimination without regard to race, creed, color, age, sex, national origin, or handicap. On bids which equal or exceed $50,000, Certificate of Responsibility classification issued by the Mississippi State Board of Contractors shall be written on the outside of the envelope containing the bids. Bids of less than $50,000 will be marked on the outside that the bid contained within does not exceed $50,000. When bids are submitted electronically, the requirement for including a certificate of responsibility, or a statement that the bid enclosed does not exceed Fifty Thousand Dollars ($50,000.00), on the exterior of the bid envelope shall be deemed in compliance by including the same information as an attachment with the electronic bid submittal. The ability to obtain any insurance required by the contract documents which does not require proof of coverage to be contained in the submitted bid (such as bid bonds), must be demonstrated in the bid by the means specified in the contract documents. Proof of actual insurance coverage must be submitted within five (5) business days from the bid acceptance. In compliance with the laws of the State of Mississippi, in choosing materials for the project, the successful bidder shall be required to give preference to materials grown, produced, prepared, made or manufactured within the State of Mississippi. The foregoing notwithstanding, no preference shall be given to materials grown, produced, prepared, made or manufactured in the State of Mississippi when other materials of like quality produced outside the State of Mississippi may be purchased or secured at less cost, or any other materials of better quality produced outside the State of Mississippi can be secured at a reasonable cost. The Contractor shall not use any materials on the project that are grown, produced, prepared, made or manufactured outside of the United States. If such materials are not available, then those which are grown, produced, prepared, made or manufactured outside the United States may be used. The City reserves the right to reject any and all bids and to waive any informality in the proposal accepted.

Bid Results

Roads / Highways

$5,284,225.00

Public - City

Paving, Site Work

84

16

14

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Unit Prices, Alternates, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Demolition, Building Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Wall Finishes, Stone Facing, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
37
Bidding Soon
502
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.