BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2022 at 7:00 PM

Updated November 15, 2023

Site work and new construction of a fire / police facility in San Diego, California. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

As of January 5, 2022, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made Closed solicitation has been included below for reference. .................. The Skyline Hills Fire Station No. 51 facility is located in Skyline Hills at 7180 Skyline Hills Dr, San Diego, California 92114. The fire station facility will house ten (10) fire personnel, and would provide for the general requirements in an area of approximately 10,700 square feet and of 2-3 stories. The project element includes: Design Drawings, Project Specifications, Permits, and Presentations to Community Planning Board, Americans with Disabilities Act [ADA]/Title 24 of the California Code of Regulations [Title 24], Leadership in Energy & Environmental Design Plan LEED and Building Commissioning that complies with the current Building Code and LEED requirements, Public Art, Underground Utilities, Archaeological Monitoring, Paleontological Monitoring, Best Management Practices [BMPs], Storm Water Standard Manual, Storm Water Pollution Control Plan [WPCP], Surveying, Record Research, Community Outreach, Environmental Investigation, Site Landscaping, Brush Management. The City shall apply a maximum of an additional 12 points for Small Local Business Enterprise (SLBE) or Emerging Local Business Enterprise (ELBE) participation, to the proposers subtotal maximum evaluation points. Additional points will be awarded as follows to achieve the proposers final maximum evaluation points:a. If the proposer achieves 20% participation, apply 5 points to the proposers score; orb. If the proposer achieves 25% participation, apply 10 points to the proposers score; orc. If the prime consultant is a SLBE or an ELBE, apply 12 points to the proposers score.The final maximum evaluation points including SLBE/ELBE is 112. Estimate Between 1,000,000 - 1,200,000 The method of contractor selection has not been determined at this time. *This project timeline has been extended due to the public health crisis.

Conceptual

Fire / Police

$1,200,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
119
Bidding Soon
1,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2022

Project location map

To Be Determined, San Diego, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.