BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2020 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a water / sewer project in Woodway, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project consists of the furnishing of all labor, materials, equipment, appurtenances and incidentals as required to properly design, fabricate, construct, inspect and test the following construction items: Project base bid includes new 400+- sf CMU chemical feed building, relocation of and modifications to existing chemical feed and storage equipment (chlorine gas, LAS, hexametaphosphate), relocation and installation of new electrical equipment, SCADA work, all appurtenances, accessories, painting, disinfection, testing, site work, and demolition of existing electrical equipment. Additive alternate bid items include improvements to existing pump station building, installation of spare high service booster pump piping, and construction of new concrete building sidewalk/apron. The project also includes an allowance for SCADA work. Bids will be received for a single prime Contract. Bids shall be on a unit price basis, with additive/deductive alternate bid items as indicated in the Bid Form. All questions must be submitted to CP&Y, INC., online before 5:00 PM CST on September 9, 2020. The Project consists ofthe furnishing of all labor, materials, equipment, appurtenances and incidentals as required to properly design, fabricate, construct, inspect and test the following construction items Bid security shall be furnished in accordance with the Instructions to Bidders. New 400-+ sf CMU chemical feed building, relocation of and modifications to existing chemical feed and storage equipment (chlorine gas, LAS, hexametaphosphate), relocation and installation of new electrical equipment, SCADA work, all appurtenances, accessories, painting, disinfection, testing, site work, and demolition of existing electrical equipment. Additive alternate bid items include improvements to existing pump station building, installation of spare high service booster pump piping, and construction of new concrete building sidewalk/apron. The project also includes an allowance for SCADA work.

Bid Results

Water / Sewer

$320,166.00

Public - City

Renovation, Site Work

56

1

2

9

Subscribe For Documents

141 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
87
Bidding Soon
1,588
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2020

October 16, 2020

Project location map

US-84, Woodway, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.