Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Austin, Texas. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; parking garage; and parking garage.
The project includes all aspects of planning, development, architecture, engineering, design, procurement, demolition, renovation, and construction of facilities and improvements for Phase Two of the Capitol Complex project, described specifically as follows: New State Office Building - approximately ten (10) level office building, totaling 360,000 gsf located at 15th Street, between Lavaca Street and Colorado Street with underground and above grade parking accommodating 1,650 parking spaces; New State Office Building - approximately five (5) level office building, totaling 165,000 gsf located at 15th Street, between Colorado Street and Congress Avenue with underground and above grade parking accommodating 900 parking spaces; Complete extension of the pedestrian mall, (Capitol Mall), located at Congress Avenue, between 15th Street and 16th Street; and All associated infrastructure to serve the buildings, structures, and improvements in Phase Two. The following properties can be described more specifically as follows: State of Texas Parking Lot #8 and Capitol Complex Childcare Facility building grounds: One full block bounded by Lavaca Street, 16th Street, Colorado Street, and 15th Street; and State of Texas Parking Lot #11 and Capitol District Office (DPS) building grounds: One half block bounded by Colorado Street, Texas Historical Commission facilities, Congress Avenue, and 15th Street; and Congress Avenue extending from 15th Street to 16th Street. Deadline for Submission of Questions 9/21/2021 Deadline for TFC to respond to submitted questions 9/28/2021 Respondents to the RFQ should consider the "Cost of Work" as two hundred twenty-four million, five hundred forty-three thousand dollars ($224,543,000.00), not including any Pre-Construction Management fees, Construction Management fees, and Construction General Conditions, as part of the construction budget or the Guaranteed Maximum Price (GMP).
Post-Bid
Municipal
$224,543,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2021
March 29, 2022
Multiple Locations, Austin, TX
Related To This Project
Austin, TX
Bid Date: Jan 26 2022
Austin, TX
Bid Date: Dec 16 2020
Austin, TX
Bid Date: Jan 13 2022
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Oct 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.