BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Toronto, Ontario. Design plans call for the construction of a water / sewer project; for site work for a water / sewer project; and for the demolition of a water / sewer project.

Replacement of the existing Pelletizer Facility (that is at the end of its design life) with the current state of art Pelletizer technology to provide a reliable, robust and long term biosolids/sludge management system for ABTP. The new Pelletizer system must be constructed in a new (optimized) location, to allow continuous operation of the existing Pelletizer facility until the new facility is built, commissioned and fully operational. Identifying the best optimized location for the new Pelletizer is one of the key elements of this assignment. Demolition of the existing Pelletizer facility is not required and is not included in the scope of this project. The scope will include a new building structure to house the new Pelletizer facilities, with minimum two pelletizers with all associated ancillary system. 2. Modifications to cake pumping, as required. New odour control facilities to ensure facility has no net increase to offsite odour receptors. New pellet storage silos and truck loading equipment. Provision of a truck weigh scale in the truck loading area. Dual connection of the new Pelletizer to the Electrical power supply at the Seawall and South substations. Provision of standby power facilities 8. Instrumentation/Control/SCADA/computer network/telecommunication elements. Demolition of existing buildings/facilities to allow construction of the new Pelletizer Building. Miscellaneous related additions/upgrades at the existing Pelletizer facility, as required to allow connection of the new Pelletizer system and to achieve a new Pelletizer system that is safe to operate and maintain. All access roads to the new facilities. Decommissioning and making zero energy state of the existing Pelletizer equipment in the existing building, not including demolition and or removal, once the new facility is commissioned. TIMELINE: The Mechanical Engineer has completed the detailed design study. Projects will proceed pending capital funding allocation. A Request For Proposals for the Prepurchase of the Pelletizer Equipment System has been issued by the owner and is followed separately. Tender for construction is expected spring 2025 with the construction start expected summer 2025 with completion expected summer 2028.

Design

Water / Sewer

$28,196,277.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
275
Bidding Soon
4,363
All Active Projects
1,772
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 5, 2025

img_map_placeholder

9 Leslie St, Toronto, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.