BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Dallas, Texas. Completed plans call for the renovation of a water / sewer project.

Furnishing all labor, material and equipment, and performing all work required for the High Service Pump Replacement project. The High Service Pump Station is in an existing facility located on the water treatment plant. The pump replacement project generally consists of, but is not limited to, removing and replacing the pump, motor and baseplate, removing and replacing the pump suction and discharge pipe, and new conductors from the VFD to the new motor. Proposals shall be accompanied by a cashiers or certified check upon a national, state bank or savings and loan in an amount not less than five percent (5%) of the total maximum bid price, payable without recourse to the Dallas County Park Cities Municipal Utility District, or a bid bond in the same amount from a reliable surety company, holding a permit from the State of Texas to act as surety, as a guarantee that the bidder will enter into a contract and execute performance bond and payment bond within fifteen (15) calendar days after notice of award of contract to him. The notice of award of contract will be given by the District within sixty (60) days following the opening of bids. No guarantee of receipt of addenda or clarifications will be made for third-party . S Christopher Schmid, P.E. may be reached with general questions at (214) 640-1768. No questions will be answered from questions posted . The low bidder must qualify within five working days after bid opening by submitting evidence as the Dallas County Park Cities Municipal Utility District may require as necessary to establish the financial responsibility, experience, and possession of such equipment as may be needed to prosecute the work in an expeditious, safe and satisfactory manner. Should the bidder fail to produce evidence satisfactory to the District as stipulated in the specifications on any of the foregoing points, he may be disqualified, and the work awarded to the next bidder so qualifying. The successful bidder must furnish a Performance bond, a Material and Labor Payment Bond, and a 2-year Maintenance Bond, all upon the form provided in the amount of 100 percent of the contract price, from an approved surety company holding a permit from the State of Texas to act as surety or other sureties acceptable to the Owner. The right is reserved, as the interest of the Dallas County Park Cities Municipal Utility District may require, to reject any and all bids, and to waive any informality in bids received.

Award

Water / Sewer

$487,500.00

Public - County

Renovation

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
64
Bidding Soon
3,535
All Active Projects
1,400
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.