Site work for a water / sewer project in Lake Park, Florida. Completed plans call for site work for a water / sewer project.

*As of November 11, 2020, a general contractor has been awarded. The Work is generally described as follows: The engineered project will establish and improve the Level of Service of Lake Shore Drive by improving drainage and addressing sea level rise as a result of storm surges, king tides, and climate change. The project includes a new drainage infrastructure, a pump station, a dry detention/bio-swale area for water quality, and in-line check valves to prevent backflow from the Intracoastal Waterway/Lake Worth Lagoon (LWL). The major items of the project include new roadway drainage, reconstruction of the roadway with curb and gutter, and sidewalks. The project design includes four locations where storm water discharges to the LWL via Existing gravity pipes (to remain). Each pipe will include a storm water pollution baffle and an in-line check valve. A 22,500 gpm pump station will be constructed to handle higher sea level conditions. The station will pump water to a new dry detention/bio-swale area to be located in an adjacent park. The detention/bio-swale area will attenuate and treat the stormwater before discharging it to the LWL via a raised inlet with a 12-inch pipe and retaining walls to channel water over the existing seawall. The project includes the reconstruction of Lake Shore Drive from 190 feet south of Date Palm Drive to 65 feet northwest of Castlewood Drive, a distance of 3,250 linear feet. Approximately 30 storm drainage inlets are included in the project which will be located in grassed swale areas. The new storm water carrying pipes include sizes up to 72 inches in diameter. The project is partially funded with a federal grant. As such, bidders are advised that there will be additional documentation requirements and obligations required of the winning bidder. Bidders are encouraged to fully review the grant document which is included as an exhibit in the bid documents. In addition, the project includes water and sewer improvements, and the Town has partnered with Seacoast Utility Authority on these items. The water and sewer components of the project shall be bid as an alternate, and may be part of the scope at the discretion of Seacoast Utility Authority. Alternatively, Seacoast Utility Authority may complete their portion of the work separately. All questions must be directed in writing by US Mail, fax, or e-mail to: Vivian Mendez, Town Clerk Town of Lake Park Phone: 561-881-3311 E-mail: townclerk@lakeparkflorida.gov Reference ITB 106-2020 Questions, and all responses will be provided to all bid holders. The last day that questions will be accepted is September 23, 2020. Pre-Bid info - It shall be the responsibility of all bidders to check the Town's website for accessibility to any meeting that may be held virtually. It is strongly advised that all potential bidders attend the pre-bid conference meeting. No Bids may be withdrawn for a period of ninety (90) days after the scheduled closing date for the receipt of bids. A cashier's check or a Bid Bond in a sum not less than five percent (5%) of the amount of the bid, made payable to the Town of Lake Park, shall accompany each Bid as a guarantee that the bidder will not withdraw from the competition after the opening of Bids. The sureties for the Bid Bond and Public Construction Bond must be an entity included in the most recent United States Department of Treasury list of acceptable sureties and be authorized to issue surety bonds in Florida. Bid Security shall be in a single acceptable instrument. If Bid Security is made by cashier's check, the conditions contained in the Bid Bond shall nonetheless apply to the cashier's check as they relate to forfeiture or damages. The Successful Bidder, who is awarded the contract, will be required to furnish a Public Construction Bond in full contract amount in accordance with Florida Statutes 255.05, as amended, and to submit a Certificate of Insurance demonstrating conformance with the Contract Documents. The Town of Lake Park reserves the right to reject any or all Bids in whole or in part, with or without cause, to waive irregularities, variances, deviations, technical errors and informalities to the extent permitted by law, or to accept the Bid which in its judgment best serves the public interest.

Award

Water / Sewer

$4,556,859.00

Public - City

Site Work

153

1

21

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
64
Bidding Soon
1,104
All Active Projects
464
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2020

December 2, 2020

img_map_placeholder

Lake Shore Dr, Lake Park, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.