Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 11, 2025 at 7:00 PM
Updated February 12, 2025
Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.
Bids will be received for a single prime contract for Brackney Landslide Area Pipeline Risk Reduction Project Project No. c702002, 504100299, 166-383-20 The Engineer's estimate anticipates that the total bid price will be $10,125,000 and the Contract Time for the completion of all the Work of the Project is 380 days The City of Santa Cruz Water Department (SCWD) developed the Project to improve the reliability of water supply infrastructure for the City of Santa Cruz (City). The Project is realigning a section of the Newell Creek Pipeline (NCP) in an area with known geological hazards to protect it from future landslide and geological movements. The NCP is a critical component of the City's water supply infrastructure that transports water from the Loch Lomond Reservoir to the City's Graham Hill Water Treatment Plant. The Brackney area segment of the NCP has been included in many SCWD risk assessments and is identified in the City's Local Hazard Mitigation Plan. The Bidder's security shall be in an amount equal to at least ten percent (10%) of the total bid price, and shall be conditioned to be forfeited to the City in the event that the Bidder, if their bid is accepted, does not execute the Contract for the Project and provide the required bonds, certificates of insurance, and endorsements as required Performance bond, payment bond, and any other bonds required by the Contract Documents shall be issued by a surety on the forms bound in the Contract Documents Technical questions and requests for information related to this Invitation for Bids should be directed to the City designated website above. All questions shall be in writing and received a minimum of 5 business days prior to the bid opening date. Questions and Clarification Submission Deadline:January 31, 2025, 5:00pm The Contract will be awarded to the lowest responsible responsive bidder. The City reserves the right to reject any or all Bids, including for any minor irregularities or defects. The City may reject a Bid if the City determines that any of the bid prices are materially unbalanced to the potential detriment of the City
Post-Bid
Water / Sewer
$10,125,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2025
April 7, 2025
Multiple Locations, Santa Cruz, CA
Related To This Project
Santa Cruz, CA
--
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Dec 07 2021
Santa Cruz, CA
Bid Date: Dec 14 2021
Santa Cruz, CA
Bid Date: Jan 07 2022
Santa Cruz, CA
Bid Date: Feb 03 2022
Santa Cruz, CA
Bid Date: Jan 18 2022
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Sep 04 2023
Santa Cruz, CA
Bid Date: Sep 21 2023
Santa Cruz, CA
Bid Date: Sep 12 2023
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Mar 03 2025
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Aug 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
