BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2020 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Downey, California. Completed plans call for site work for a water / sewer project.

As of 10/08/2020 Anticipated construction start date: 1st week of November 2020 Duration: 90 working days Contractor shall adjust to grade sewer manhole frame and cover to grade, water valve lid and cover and cover and other utilities to be adjusted to grade highlighted as shown on plans and all other scope of work not mentioned above including, but not limited to, excavation, removal, pavement around manholes and utility valves, restoration of existing improvements to match existing, traffic control and any other items to complete scope as shown in drawings

Award

Water / Sewer

$2,245,893.00

Public - City

Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
268
Bidding Soon
3,462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2020

November 2, 2020

Project location map

Old River School Rd, Downey, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.