BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Madison, Wisconsin. Completed plans call for the construction of a 12-story above grade multi-residential development; retail development; parking garage; for site work for a parking garage; and for paving for a parking garage.

As of August 2nd, 2024 this project is currently in the pre-construction stages. Work on the garage portion will begin in January of 2025. The State Street Campus Garage at 415 N. Lake Street was constructed in 1964 and contains 510 regular stalls, 7 disabled stalls, 24 bicycle spaces, 16 motorcycle/moped spaces, 2 electric vehicle charging stations, and 5 spaces for authorized vehicles (City staff, cashiers, etc). The 542 space addition at 430 N. Frances Street was constructed in 1982. The original structure is approaching the end of its useful life and has become financially challenging for the City to continue to invest in its ongoing maintenance. the original structure is approaching the end of its useful life and has become financially challenging for the City to continue to invest in its ongoing maintenance. The City of Madison is pursuing a new development opportunity that will be a mixed-use project containing an intercity bus terminal, public parking structure, ground floor retail, and student housing. Question Deadline 10/26/2023 Any questions or requests for clarifications regarding plans and specifications shall be submitted directly to Eppstein Uhen Architects and the City Project and Construction Managers The City of Madison is pursuing a new public and private development opportunity that includes the demolition and replacement of the existing State Street Campus Garage (SSCG) at 415 North Lake Street. The proposed building project will be completed in two construction phases. Phase 1 -the Public Works project titled State Street Campus Garage Mixed-Use Project - includes demolition of the existing SSCG and proposed construction will include an intercity bus terminal, public parking structure, and "gray box" spaces for final build out by a private Developer (i.e. Mortenson Development, Inc.). Phase 2 - constructed by the Developer and not included in the scope of this contract- will include private housing components built on top and within the Phase 1 construction. PN-22019, 22.0249

Award

Multi-Residential

$36,249,591.00

Public - City

Demolition, New Construction, Paving, Site Work

359

37

337

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
49
Bidding Soon
956
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

December 22, 2023

img_map_placeholder

415 N Lake St, Madison, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.